CityLA
Posted
Oct 26, 2026
Dec 1, 2026
Engineering Design of Amiss WTP HiLo Building Rehabilitation 2024 Bond Project(Request for Qualifications)
Seeking professional engineering consultant (PEC) to provide engineering services for the design and construction services for the abandonment of the Amiss Water Treatment Plant High/Low Pump Station Building.
