CityCA
Posted
Aug 18, 2026
Sep 30, 2026
Wastewater Infrastructure Improvements Project (Request for Proposals)
The project consists of lining, repairing, and improving sewer infrastructure at various locations Citywide.
Description: The City of Ray City is soliciting sealed bids for construction of the ARPA-SFRF Wastewater Infrastructure Project Phase 2 WPCP Improvements. The work includes bypass pumping, modifications to the influent pumping station, new plant headworks with mechanically and manually cleaned bar screens, flow metering, an automatic wastewater sampler, sitework, surface restoration, and related work. Bids must be submitted to the City Clerk at Ray City city hall by 2:00 PM local time on September 11, 2026; this is a construction procurement, not a grant application.
City · GA, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalThese related opportunities are still open for bidding.
CityCA
Posted
Aug 18, 2026
Sep 30, 2026
The project consists of lining, repairing, and improving sewer infrastructure at various locations Citywide.
CityOR
Posted
Sep 9, 2026
Oct 7, 2026
Work includes approx. of 4,742 LF of 10" sanitary sewer force main - class III backfill; 517 LF of 10" sanitary sewer force main - class IV backfill; 18 VLF of sanitary sewer manhole (greater than 8' depth); 110 LF of 6" water line - class ill backfill; 6 LF of 8" water line - class iii backfill.
Posted
-
Sep 29, 2026
1. 3,749 CY excavation of unsuitable materials or ditch cleaning; 2. 3,899 CY fill material to raise dike and raise eroded areas; 3. 3,500 LF pond dike shaping; 4. 308 LF straw wattles; 5. 1,523 SY erosion control blanket; 6. 2,600 SY of removing and disposing of shrubs and saplings; 7. Remove and dispose of 14 trees; 8. 2,090 tn gravel surfacing; 9. 2 turtle guards on existing structures; 10. 3 pond depth indicators; 11. 142 FT of remove and replace 18" CMP; 12. 210 lf total of triple 36” CMP arch equivalent; 13. 101 LF 12" PVC sanitary sewer; 14. 57 LF 12" dip sanitary sewer; 15. 158 LF post-televising sanitary sewer; 16. Replace 2 manholes; 17. 2 sanitary sewer connections; 18. 5,050 TN rip rap; 19. 3,294 SY fabric filter; 20. 12,230 SY seeding, fertilizing and mulch; 21. 4 tube frame gates; 22. 14 fence signs; 23. Pumping between cells; 24. Replace concrete cover on lift station wet well; 25. Replace electrical conduit for lift station pump.
CityLA
Posted
Jul 29, 2026
Sep 22, 2026
Work includes wastewater collection improvements phase 1 - pump stations.