Southwest Delaware County Municipal (Sewer) Authority
Special DistrictPA
Posted
Dec 18, 2024
Nov 17, 2026
Woodbrook Pump Station Electrical Upgrades RFP
Work includes electrical upgrades and scada upgrades at the swdcma administration building and pump stations. Contractor shall perform upgrades to the pump station by supplying equipment, materials, and labor to replace the existing pump control panel and vfds with new upgraded equipment including but not limited to a new vfd and harmonic filter, and to install a scada and scada panel in pump station including administration building hardware and administration integration/programming. Work also includes miscellaneous demolition, wet well lighting, mobilization and demobilization, insurance and bonding, and permits. See attached file.
