Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Drainage Basin Design Plan - Element 80 and 320 Improvements.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The work includes shaft, portal, and tunnel construction; tunnel enlargement; wetland construction; construction of a collection box, culvert sections, diversion structure, and solids removal device in existing canal; an outfall pipe, concrete outfall structure, outfall piping, and outfall apron; demolition work, intake system, roadway improvements, associated electrical, mechanical and instrumentation work including an instrumentation building, and site restoration.
Posted Date
Oct 16, 2025
Due Date
Jan 16, 2026
Release: Oct 16, 2025
Close: Jan 16, 2026
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The work includes shaft, portal, and tunnel construction; tunnel enlargement; wetland construction; construction of a collection box, culvert sections, diversion structure, and solids removal device in existing canal; an outfall pipe, concrete outfall structure, outfall piping, and outfall apron; demolition work, intake system, roadway improvements, associated electrical, mechanical and instrumentation work including an instrumentation building, and site restoration.
Procurement of drainage repair services for Bolton's Branch Drainage Improvements.
Posted Date
Dec 17, 2025
Due Date
Jan 14, 2026
Release: Dec 17, 2025
Close: Jan 14, 2026
Procurement of drainage repair services for Bolton's Branch Drainage Improvements.
AvailableRelease: Dec 16, 2025
Close: Jan 20, 2026
Work includes drainage improvements.
AvailableMill and Relay 4” Asphalt Payment – 5,100 SY Removing Reinforced Concrete Panels – 87 EA Concrete Curb and Gutter – 24" – 1,650 LF Reinforced Concrete Panel – 9’-11” x 2’ x 4.5” – 87 EACH HMA Pavement 3 LT 58-28 S and 4 LT 58-28 S– 870 TON HMA Pavement 4 LT 58-28 S – 580 TON HMA Sidewalk 5 LT 58-28 S (Single Layer) – 180 TON 3/4, 1 1/4, 3" Base Aggregate Dense, and Base Aggregate Open Graded – 6,850 TON Geotextile, Type DF Schedule A – 11,600 SY Geogrid Reinforcement, Type SR (Undistributed) – 3,900 SY EPDM Liner (45 Mil) – 450 SY Excavation Common – 2,950 CY Undercutting, EBS of Soft/Yielding Areas (Undistributed) – 1,100 CY Landscaping Restoration – 800 SY Traffic Control – 1 LS Temporary Portable Traffic Control Signals – Undistributed – 2 EA Concrete Barrier Temporary Precast – Undistributed – 1,300 LF – Drainage improvements Inlet Protection Type B, C, and Ditch Checks – 28 EA Remove and Replace Adjusting Rings, Tuckpoint – 8 EA Inlets 4-ft Diameter with R-3067-R Frame and Grate – 6 EA Pipe Underdrain Installation 6-Inch – 3,050 LF Riprap Extra-Light – 250 TON Geotextile Fabric Type SAS – 360 SY Ditch Regrading – 400 LF Landscaping Restoration – 740 SY
Posted Date
Jan 6, 2026
Due Date
Jan 29, 2026
Release: Jan 6, 2026
Close: Jan 29, 2026
Mill and Relay 4” Asphalt Payment – 5,100 SY Removing Reinforced Concrete Panels – 87 EA Concrete Curb and Gutter – 24" – 1,650 LF Reinforced Concrete Panel – 9’-11” x 2’ x 4.5” – 87 EACH HMA Pavement 3 LT 58-28 S and 4 LT 58-28 S– 870 TON HMA Pavement 4 LT 58-28 S – 580 TON HMA Sidewalk 5 LT 58-28 S (Single Layer) – 180 TON 3/4, 1 1/4, 3" Base Aggregate Dense, and Base Aggregate Open Graded – 6,850 TON Geotextile, Type DF Schedule A – 11,600 SY Geogrid Reinforcement, Type SR (Undistributed) – 3,900 SY EPDM Liner (45 Mil) – 450 SY Excavation Common – 2,950 CY Undercutting, EBS of Soft/Yielding Areas (Undistributed) – 1,100 CY Landscaping Restoration – 800 SY Traffic Control – 1 LS Temporary Portable Traffic Control Signals – Undistributed – 2 EA Concrete Barrier Temporary Precast – Undistributed – 1,300 LF – Drainage improvements Inlet Protection Type B, C, and Ditch Checks – 28 EA Remove and Replace Adjusting Rings, Tuckpoint – 8 EA Inlets 4-ft Diameter with R-3067-R Frame and Grate – 6 EA Pipe Underdrain Installation 6-Inch – 3,050 LF Riprap Extra-Light – 250 TON Geotextile Fabric Type SAS – 360 SY Ditch Regrading – 400 LF Landscaping Restoration – 740 SY
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.