Summary
Mill and Relay 4” Asphalt Payment – 5,100 SY Removing Reinforced Concrete Panels – 87 EA Concrete Curb and Gutter – 24" – 1,650 LF Reinforced Concrete Panel – 9’-11” x 2’ x 4.5” – 87 EACH HMA Pavement 3 LT 58-28 S and 4 LT 58-28 S– 870 TON HMA Pavement 4 LT 58-28 S – 580 TON HMA Sidewalk 5 LT 58-28 S (Single Layer) – 180 TON 3/4, 1 1/4, 3" Base Aggregate Dense, and Base Aggregate Open Graded – 6,850 TON Geotextile, Type DF Schedule A – 11,600 SY Geogrid Reinforcement, Type SR (Undistributed) – 3,900 SY EPDM Liner (45 Mil) – 450 SY Excavation Common – 2,950 CY Undercutting, EBS of Soft/Yielding Areas (Undistributed) – 1,100 CY Landscaping Restoration – 800 SY Traffic Control – 1 LS Temporary Portable Traffic Control Signals – Undistributed – 2 EA Concrete Barrier Temporary Precast – Undistributed – 1,300 LF – Drainage improvements Inlet Protection Type B, C, and Ditch Checks – 28 EA Remove and Replace Adjusting Rings, Tuckpoint – 8 EA Inlets 4-ft Diameter with R-3067-R Frame and Grate – 6 EA Pipe Underdrain Installation 6-Inch – 3,050 LF Riprap Extra-Light – 250 TON Geotextile Fabric Type SAS – 360 SY Ditch Regrading – 400 LF Landscaping Restoration – 740 SY