Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Mill and Relay 4” Asphalt Payment – 5,100 SY Removing Reinforced Concrete Panels – 87 EA Concrete Curb and Gutter – 24" – 1,650 LF Reinforced Concrete Panel – 9’-11” x 2’ x 4.5” – 87 EACH HMA Pavement 3 LT 58-28 S and 4 LT 58-28 S– 870 TON HMA Pavement 4 LT 58-28 S – 580 TON HMA Sidewalk 5 LT 58-28 S (Single Layer) – 180 TON 3/4, 1 1/4, 3" Base Aggregate Dense, and Base Aggregate Open Graded – 6,850 TON Geotextile, Type DF Schedule A – 11,600 SY Geogrid Reinforcement, Type SR (Undistributed) – 3,900 SY EPDM Liner (45 Mil) – 450 SY Excavation Common – 2,950 CY Undercutting, EBS of Soft/Yielding Areas (Undistributed) – 1,100 CY Landscaping Restoration – 800 SY Traffic Control – 1 LS Temporary Portable Traffic Control Signals – Undistributed – 2 EA Concrete Barrier Temporary Precast – Undistributed – 1,300 LF – Drainage improvements Inlet Protection Type B, C, and Ditch Checks – 28 EA Remove and Replace Adjusting Rings, Tuckpoint – 8 EA Inlets 4-ft Diameter with R-3067-R Frame and Grate – 6 EA Pipe Underdrain Installation 6-Inch – 3,050 LF Riprap Extra-Light – 250 TON Geotextile Fabric Type SAS – 360 SY Ditch Regrading – 400 LF Landscaping Restoration – 740 SY
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The City of Miami Springs seeks a qualified contractor to construct the South Drive Stormwater and Roadway Improvement Project to provide water quality, stormwater management, and beautification along the South Drive corridor. The scope includes localized drainage, roadway geometry and landscape improvements, enhancements to roundabouts, and measures to accommodate pedestrian, cyclist, and motorist safety while reducing flooding. This opportunity is issued as an Invitation for Bid (ITB) and includes a mandatory pre-bid meeting; supporting bid documents are available on the original posting linked from the aggregator.
Posted Date
Dec 4, 2025
Due Date
Jan 27, 2026
Release: Dec 4, 2025
Close: Jan 27, 2026
The City of Miami Springs seeks a qualified contractor to construct the South Drive Stormwater and Roadway Improvement Project to provide water quality, stormwater management, and beautification along the South Drive corridor. The scope includes localized drainage, roadway geometry and landscape improvements, enhancements to roundabouts, and measures to accommodate pedestrian, cyclist, and motorist safety while reducing flooding. This opportunity is issued as an Invitation for Bid (ITB) and includes a mandatory pre-bid meeting; supporting bid documents are available on the original posting linked from the aggregator.
AvailableProcurement of roadway concrete drainage swale and embankment armament improvements along Lakeshore Drive and Lake Taneycomo, totaling 0.272 miles.
Posted Date
Dec 29, 2025
Due Date
Jan 16, 2026
Release: Dec 29, 2025
Close: Jan 16, 2026
Procurement of roadway concrete drainage swale and embankment armament improvements along Lakeshore Drive and Lake Taneycomo, totaling 0.272 miles.
AvailableThis RFP is for the removal of existing drainage infrastructure and installation of a new box culvert across Washington Avenue, including elevation and repaving of the roadway, and replacement of existing utilities.
Posted Date
Dec 14, 2025
Due Date
Jan 21, 2026
Release: Dec 14, 2025
Close: Jan 21, 2026
This RFP is for the removal of existing drainage infrastructure and installation of a new box culvert across Washington Avenue, including elevation and repaving of the roadway, and replacement of existing utilities.
AvailableThe project includes the following work: the removal of existing drainage infrastructure and installation of a new box culvert. Including elevation of the existing roadway, repaving for the new roadway, and replacement of existing utilities.
Posted Date
Dec 14, 2025
Due Date
Jan 21, 2026
Release: Dec 14, 2025
Close: Jan 21, 2026
The project includes the following work: the removal of existing drainage infrastructure and installation of a new box culvert. Including elevation of the existing roadway, repaving for the new roadway, and replacement of existing utilities.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis