Posted
Nov 19, 2026
Dec 4, 2026
Wolf Creek Powerhouse Bridge Crane Rehabilitation (Request For Quotation) Jamestown
Bridge crane rehabilitation. One (1) Main Hoist rated at 125 tons One (1) Auxiliary Hoist rated at 25 tons. See attached file.
Description: SOURCES SOUGHT / REQUEST FOR INFORMATION (RFI) MARKET RESEARCH FOR WOLF CREEK POWERHOUSE BRIDGE CRANE REHABILITATION DISCLAIMER: THIS IS A REQUEST FOR INFORMATION (RFI) / SOURCES SOUGHT NOTICE BEING RELEASED PURSUANT TO THE REVOLUTIONARY FEDERAL ACQUISITION REGULATION OVERHAUL (RFO) PART 10: MARKET RESEARCH. This RFI is issued solely for informational, market research, and planning purposes. It does not constitute an Invitation for Bid (IFB), Request for Quote (RFQ), or Request for Proposal (RFP), nor does it constitute a promise to issue an IFB, RFQ, or RFP in the future. No solicitation document exists at this time. Issuance of this notice does not constitute any obligation on the part of the Government and is not to be construed as a commitment by the Government, implied or otherwise, to issue a solicitation or award a contract. Respondents are advised that the United States Government will not pay for any information or administrative costs incurred in response to this RFI. Proprietary information is not being requested, and respondents should refrain from submitting proprietary or business-sensitive data. Detailed technical specifications and drawings will only be made available upon issuance of a formal solicitation. 1. PURPOSE The Government is conducting this Sources Sought / RFI in support of market research to identify potential qualified and capable industry partners, including small businesses (Small Businesses, 8(a), HUBZone, Service-Disabled Veteran-Owned Small Businesses [SDVOSB], and Women-Owned Small Businesses [WOSB]). The purpose of this notice is to gain knowledge regarding industry interest, capabilities, technical qualifications, and potential subcontracting arrangements to assist the Government in determining the appropriate acquisition strategy and competition basis. 2. PROJECT SCOPE OF WORK The contemplated requirement is for a firm-fixed-price standalone contract for the complete rehabilitation of the existing powerhouse bridge crane and incidental related work at the Wolf Creek Powerhouse in Jamestown, Kentucky. Crane Description: The existing powerhouse bridge crane is a 250-ton, top-running bridge type crane consisting of two bridge girders and two independent trolleys. Each existing trolley features: One (1) Main Hoist rated at 125 tons One (1) Auxiliary Hoist rated at 25 tons Major Work Items: The Contractor will be responsible for furnishing all labor, materials, supervision, engineering, tooling, and equipment required to complete the rehabilitation, which includes, but is not limited to, the following major items: Safety & Access: Modify personnel access and implement safety improvements to the bridge crane walkways, ladders, and maintenance platforms. Couplings & Seals: Replace hoist motor output shaft brake wheel coupling seals. Braking Systems: Replace hoist brake pads and perform comprehensive service to restore proper brake gap and operational torque. Gearboxes & Lubrication: Clean speed reducers (main hoist, auxiliary hoist, bridge drive, and trolley drive) and replace all lubricating oil; inspect and repair grease lubrication lines; replace main hoist open gear oil. Wheel & Axle Assemblies: Modify bridge and trolley wheel assemblies to replace original wheel bushings with new anti-friction roller bearings. (Note: The Contractor may have the option to replace entire wheel and axle assemblies or modify and reuse existing wheels and axles). Below-the-Hook Devices: Provide new, and perform non-destructive inspection, proof-load testing, and painting of below-the-hook lifting devices. Drives & Automation: Upgrade all variable frequency drives (VFDs) to Magnetek Series 5 VFDs (or approved system equal). Electrification & Grounding: Furnish and install a new fourth conductor bar dedicated as a continuous ground conductor; modify existing collectors to connect to the fourth conductor bar. Operator Cab & Controls: Provide and install a new ergonomic operators chair, wireless radio remote controllers, absolute hoist encoders, and high-efficiency LED bridge crane lights. Safety Instrumentation & Limits: Install load cell weighing devices and displays for both main and auxiliary hoists, along with new heavy-duty limit switches for bridge and trolley travel. Auxiliary Hoists: Furnish and install a new auxiliary tool hoist and a dedicated personnel rescue hoist. Testing & Commissioning: Perform full operational testing of all mechanical and electrical features of the crane, followed by 100% rated and 125% rated load tests in accordance with CMAA and OSHA requirements. Documentation: Develop and deliver a comprehensive new Operation and Maintenance (O&M) Manual integrating all legacy data from the existing manual with new equipment data to serve as a complete standalone guide. Blocks, Sheaves & Lifting Beams: Provide new main and auxiliary lower load block assemblies. Provide new main and auxiliary upper sheaves and pins. Provide new main hoist lifting beam, rotor lifting device, and turbine shaft lifting device. 15.Crane Runway Rails: Survey and modify existing runway crane rails to correct rail span, elevation, and straightness along the entire runway length. 3. CAPABILITY STATEMENT AND CONTRACTOR SURVEY Interested firms capable of performing the work described herein are requested to submit a capability package containing the following information: A. General Information Company Name: Physical Address / Mailing Address: Point(s) of Contact: (Name, Title, Phone Number, and Email Address) CAGE Code: Unique Entity Identifier (UEI): Company Website: B. Business Size and Socioeconomic Classification Under NAICS Code 333923 (Size Standard: 1,250 employees), is your firm categorized as a: ? Large Business ? Small Business If certified as a Small Business, identify any applicable socioeconomic designations: ? Small Disadvantaged Business (SDB) / 8(a) ? Historically Underutilized Business Zone (HUBZone) ? Service-Disabled Veteran-Owned Small Business (SDVOSB) ? Veteran-Owned Small Business (VOSB) ? Woman-Owned Small Business (WOSB) ? Economically Disadvantaged Woman-Owned Small Business (EDWOSB) C. Relevant Past Performance / Technical Experience Submit a minimum of two (2) and up to three (3) relevant projects completed within the past ten (10) years demonstrating experience as a Prime Contractor or Subcontractor performing major rehabilitation, modernization, or installation on heavy industrial hoisting machinery (minimum 100-ton capacity). Provide the following details for each reference project: Project Title: Contract Number (if applicable): Client / Agency / Customer Point of Contact (Name, Title, Phone, Email): Role (Prime or Subcontractor): Contract Value / Final Dollar Amount: Period of Performance / Completion Date: Self-Performed Work: (Identify the scope/type and percentage of work self-performed based on contract value) Detailed Project Narrative: Include details highlighting specific experience with: Heavy lifting machinery rehabilitation (brakes, gears, sheaves, and wheel assemblies) Crane electrification, Magnetek or modern crane-duty VFD retrofits, encoders, and radio controls Runway rail realignment/surveying and proof-load testing up to 100% and 125% D. Subcontracting and Execution Strategy In accordance with RFO 52.219-14 (Limitations on Subcontracting), what estimated percentage of the total contract value would your firm perform directly (self-perform)? 2. What specific scopes of work do you anticipate subcontracting out (e.g., rail surveying, machining, electrical, painting, testing)? 3. If your firm is a Small Business, do you anticipate subcontracting primarily to other Small Businesses or utilizing specialty Large Business manufacturers for specialized hardware? E. Bonding Capacity Single Project Bonding Capacity:___ Aggregate Bonding Capacity:___ F. Project Interest If a formal solicitation (Request for Proposal) is advertised for this requirement using a Best Value Tradeoff (BVTO) source selection process, does your firm anticipate submitting a proposal? ? Yes ? No 4. SUBMISSION INSTRUCTIONS Responses to this Sources Sought notice must be submitted electronically via email to the Contract Specialist and Contracting Officer identified below. Submission Deadline: December 4th, 2026 at 11:00 AM Central Time Subject Line: Response to Sources Sought - Wolf Creek Powerhouse Bridge Crane Rehab (NAICS 333923) Points of Contact: Contract Specialist: Diana Namara / Diana.L.Namara@usace.army.mil Contracting Officer: Bridget Passatore / Bridget.L.Passatore@usace.army.mil Please limit capability statements to no more than seven (7) pages (excluding standard certifications and cover pages). All responses must be transmitted in PDF format.
Federal · TN, US
Original attachments and procurement documents tied to this bid.
Adjacent opportunities open for bidding right now.
Posted
Nov 19, 2026
Dec 4, 2026
Bridge crane rehabilitation. One (1) Main Hoist rated at 125 tons One (1) Auxiliary Hoist rated at 25 tons. See attached file.
Posted
Nov 17, 2026
Dec 10, 2026
Black Creek Bridge Rehabilitation 2027-01-088 Closing Date: 12/10/2026 01:00:00 PM ET Detail: Rehabilitation of a three span concrete rigid frame bridge within the United Counties of Stormont, Dundas and Glengarry, on County Road 1 (Site ID: 01-088), approximately 2.5 km south of County Road 18. Work generally includes, but is not limited to: implementation of traffic control measures including temporary traffic signals, removal and replacement of asphalt wearing surface and waterproofing on bridge deck, scarify and overlay concrete bridge deck, supply and installation of cathodic protection, removal of existing barrier and replacement with concrete parapet wall with single steel railing, completion of partial depth removals and repairs on deck fascia, soffit, abutment walls and wingwalls, replacement of approach guiderail, replacement of approach asphalt.
CountyIN
Posted
Nov 10, 2026
Nov 30, 2026
Work includes rehabilitation of boone county bridge.
CityOK
Posted
Nov 17, 2026
Dec 15, 2026
The City of Broken Arrow is soliciting construction bids for pedestrian bridge improvements at Wolf Creek Park. The work includes removing the existing bridge, regrading and protecting the creek banks, and building a replacement bridge with related drainage, sidewalk, and other site improvements. The contractor will transport, assemble, and install the City-procured bridge structure and complete the work within 140 calendar days.