Summary
Perform replacement of approx. 5,400 LF of water main with new 10" PVC water main. The project shall include all piping, fittings, couplings, accessories and appurtenances, site restoration, temporary provisions to maintain water service to residents to the extent practical, testing, bacteriological clearance, pressure testing, water service connection, removal and/or grout filling of the existing piping as specified, obtaining all required permits, compliance with permit conditions, Village of Tequesta Water Utility Standards and Palm Beach County (PBC) Standards, and any other items depicted on the drawings and described in the Contract documents and reference materials. In addition to infrastructure improvements, this project shall include roadway, swale and shoulder restoration located in the public right-of-way including pavement, signage, driveways, fencing, landscaping and other miscellaneous items.