Low-pressure force main replacement. Including 53 LF of 3" HDPE DR-17 Force Main (Improved Area); 18 LF of 4" HDPE DR-17 Force Main (Improved Area); 489 LF of 6" HDPE DR-17 Force Main (Improved Area); 68 LF of 8" HDPE DR-17 Force Main (Improved Area); 126 LF of 8" HDPE DR-17 Force Main (Unimproved Area); 1,472 LF of 10" HDPE DR-17 Force Main (Improved Area); 8,351 LF of 12" HDPE DR-17 Force Main (Improved Area); 760 LF of 12" HDPE DR-17 Force Main (Unimproved Area); 1,250 LF of 1.5" HDPE DR-11 Service Lateral; 26 LF of 2" PVC SDR-21 Force Main (Improved Area); 5 LF of 2.5" PVC SDR-21 Force Main (Improved Area); 23 LF of 12" PVC SDR-35 Gravity Sewer Line (Improved Area, 0'-8' Deep); 8 VF of 4' Pre-Cast Sanitary Sewer Manhole; 8 VF of 4' Doghouse Sanitary Sewer Manhole; 1,003 LF Unimproved Surface - Lawns/Field; 150 LF Improved Surface - Gravel; 50 LF Improved Surface – Asphalt Driveway; 430 LF Improved Surface – Municipal Road; 420 LF Improved Surface – Concrete Sidewalk; 10,744 LF Improved Surface – Full Depth State Road Restoration; 250 LF Improved Surface – Concrete curb. See attached file.