Arkansas Game and Fish Commission
State AgencyAR
Aug 9, 2026
Closes
Sep 8, 2026
Jonesboro Field Office Reconstruction RFP
Provide office reconstruction.
Description: Provide architectural/engineering design services for the high school football field reconstruction.
City · CT, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalProcurement and program contacts connected to City of Waterbury.
These related opportunities are still open for bidding.
Arkansas Game and Fish Commission
State AgencyAR
Aug 9, 2026
Closes
Sep 8, 2026
Provide office reconstruction.
Arkansas Game and Fish Commission
State AgencyAR
-
Closes
Sep 8, 2026
This RFP is for reconstruction services for the Jonesboro Field Office.
Aug 14, 2026
Closes
Sep 4, 2026
The City and Borough of Juneau is requesting proposals from qualified consultants to provide design services for the Foster Avenue Reconstruction project. The work covers underground storm drainage, water and sewer utilities, road base, pavement, sidewalk, and miscellaneous improvements, with bid-ready construction drawings, specifications, a bid schedule, an engineer's estimate, and critical material lead-time information required. The project is expected to be bid in multiple phases because of funding limitations, and the consultant must conduct at least two design workshops with CBJ Engineering and develop conceptual and final designs.
CityON
Jul 17, 2026
Closes
Aug 28, 2026
The City of Clarence-Rockland is undertaking design for the road rehabilitation of David Street (rue David) and Outaouais Side Road (Rue de la Montée Outaouais) to address aging infrastructure, drainage deficiencies, and increasing transportation demands driven by regional growth. Both corridors are identified in the City’s Transportation Master Plan and require upgrades to meet current safety, operational, and capacity standards. The consultant must complete detailed and functional design supported by studies and investigations; consultant submissions need not be bilingual, while public-facing communications such as Class EA consultation materials must be prepared in both official languages as required.