Summary
The scope of work includes furnishing and installing a masonry block building with lighting, electrical, mechanical, interior and exterior water piping, interior and exterior valves, controls, and all related appurtenances; building site work and building pad; coordination and installation of electric and gas services; connection to the existing water main; furnishing and installing well pumps, discharge piping, connection to water piping, controls, and electrical for two wells. Work also includes demolition of two existing well house structures and abandoning two wells and other miscellaneous items of work.