CityIA
Posted
Nov 3, 2026
Dec 17, 2026
Melrose Ave Water Main Replacement Project RFP
Work includes approx. 333 CY of excavation; 1,424 LF of 16" DI water main; 330 LF of 16" DI trenchless water main directional drill; 391 LF of 16" DI trenchless water main installed in 24" steel casing; 10 LF of 1" copper water service pipe; 1 EA of water service abandonment; 440 LF of 12" water main abandonment pipe 20" casing; 27 SY of 9" PCC pavement C-SUD or C-SUDHW; 45 SY of 2" HMA pavement; 133 SY of 6" sidewalk PCC.
