Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
This project will rehabilitate the pavement.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Procurement of services for residential roof rehabilitation, including existing roof removal, structural repairs, and installation of new 30-year dimensional fiberglass asphalt shingles.
Posted Date
-
Due Date
Dec 31, 2099
Close: Dec 31, 2099
Procurement of services for residential roof rehabilitation, including existing roof removal, structural repairs, and installation of new 30-year dimensional fiberglass asphalt shingles.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide approx 13,650 LF Remove and Replace Concrete Curb and Gutter; 130 SY Remove and Replace Concrete Walk; 45,500 SY Full Depth Reclamation; 1,600 CY Excavation - Common (CV); 45,500 SY Type SP 9.5 Wearing Course Mix (3,C) 1.5" Thick; etc.
Posted Date
Dec 1, 2025
Due Date
Jan 20, 2026
Release: Dec 1, 2025
Close: Jan 20, 2026
Provide approx 13,650 LF Remove and Replace Concrete Curb and Gutter; 130 SY Remove and Replace Concrete Walk; 45,500 SY Full Depth Reclamation; 1,600 CY Excavation - Common (CV); 45,500 SY Type SP 9.5 Wearing Course Mix (3,C) 1.5" Thick; etc.
Available2025 sewer rehabilitation project.
Posted Date
Jan 12, 2026
Due Date
Feb 4, 2026
Release: Jan 12, 2026
Close: Feb 4, 2026
2025 sewer rehabilitation project.
AvailableProject includes rehabilitation of the existing asphalt roadway on by milling, pulverizing, and overlaying. Approx. 1,450 L.F
Posted Date
Jan 7, 2026
Due Date
Jan 20, 2026
Release: Jan 7, 2026
Close: Jan 20, 2026
Project includes rehabilitation of the existing asphalt roadway on by milling, pulverizing, and overlaying. Approx. 1,450 L.F
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →