Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Construction of PFAS pre-treatment for Well 3 and associated systems. PFAS pre-treatment will repurpose existing temporary PFAS treatment system which includes 4 pressure vessels to remove iron and manganese prior to GAC vessels. The project also includes chemical feed equipment, building expansion, instrumentation and controls and related piping and equipment within the Village.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work consist of 8" dia DIP, furnishing and installing water mains, including fittings, thrust restraint, excavation and backfill, temporary pavement, permanent pavement within trench limits, and surface restoration, 6" dia DIP, 8" dia mechanical joint gate valves, 6" diameter mechanical joint gate valves, installation of new hydrant, tee, valve and branch piping, relocation of existing fire hydrant, including new tee, valve, and branch piping, hydrostatic pressure testing of water mains, disinfection and bacterial testing of water mains. See attached file.
Posted Date
Jan 8, 2026
Due Date
Feb 10, 2026
Release: Jan 8, 2026
Close: Feb 10, 2026
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work consist of 8" dia DIP, furnishing and installing water mains, including fittings, thrust restraint, excavation and backfill, temporary pavement, permanent pavement within trench limits, and surface restoration, 6" dia DIP, 8" dia mechanical joint gate valves, 6" diameter mechanical joint gate valves, installation of new hydrant, tee, valve and branch piping, relocation of existing fire hydrant, including new tee, valve, and branch piping, hydrostatic pressure testing of water mains, disinfection and bacterial testing of water mains. See attached file.
Brook acres wellfield PFAS treatment. The project includes constructing a 18' x 36' treatment facility to provide improved treatment for PFAS removal. The project will include constructing an above-ground facility inclusive of civil, mechanical, electrical, instrumentation, and site work.
Posted Date
Dec 15, 2025
Due Date
Feb 9, 2026
Release: Dec 15, 2025
Close: Feb 9, 2026
Brook acres wellfield PFAS treatment. The project includes constructing a 18' x 36' treatment facility to provide improved treatment for PFAS removal. The project will include constructing an above-ground facility inclusive of civil, mechanical, electrical, instrumentation, and site work.
AvailableThe contractor shall furnish all necessary materials, labor, tools, equipment and other incidental and appurtenant work necessary for: the equipping of well no. 8; construction of a new booster pump station; construction of an ion exchange pfas treatment system; construction of sodium hypochlorite storage and feed system with storage building; construction of two (2) permanent diesel generators; construction of yard piping and vaults; construction of drainage piping; construction of electrical, instrumentation and controls improvements; construction of new electrical service; and all appurtenant work for a complete and operating system.
Posted Date
Jan 14, 2026
Due Date
Mar 17, 2026
Release: Jan 14, 2026
Close: Mar 17, 2026
The contractor shall furnish all necessary materials, labor, tools, equipment and other incidental and appurtenant work necessary for: the equipping of well no. 8; construction of a new booster pump station; construction of an ion exchange pfas treatment system; construction of sodium hypochlorite storage and feed system with storage building; construction of two (2) permanent diesel generators; construction of yard piping and vaults; construction of drainage piping; construction of electrical, instrumentation and controls improvements; construction of new electrical service; and all appurtenant work for a complete and operating system.
AvailableThis solicitation seeks bids to construct a PFAS treatment facility at the Tyngsborough wellfield to address PFAS contamination; documents and plan sets are available through the Tighe & Bond bidding portal (registration required). Bids are due February 19, 2026, with trade/sub-bids due February 5, 2026, and a non-mandatory pre-bid conference held January 21, 2026. The posting is published on Tighe & Bond's bidding site on behalf of the Town of Tyngsborough and is funded via the DWSRF program (not a grant).
Posted Date
Jan 9, 2026
Due Date
Feb 19, 2026
Release: Jan 9, 2026
Close: Feb 19, 2026
This solicitation seeks bids to construct a PFAS treatment facility at the Tyngsborough wellfield to address PFAS contamination; documents and plan sets are available through the Tighe & Bond bidding portal (registration required). Bids are due February 19, 2026, with trade/sub-bids due February 5, 2026, and a non-mandatory pre-bid conference held January 21, 2026. The posting is published on Tighe & Bond's bidding site on behalf of the Town of Tyngsborough and is funded via the DWSRF program (not a grant).