Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The contractor shall furnish all necessary materials, labor, tools, equipment and other incidental and appurtenant work necessary for: the equipping of well no. 8; construction of a new booster pump station; construction of an ion exchange pfas treatment system; construction of sodium hypochlorite storage and feed system with storage building; construction of two (2) permanent diesel generators; construction of yard piping and vaults; construction of drainage piping; construction of electrical, instrumentation and controls improvements; construction of new electrical service; and all appurtenant work for a complete and operating system.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Davie County Public Utilities is seeking bids for the replacement of the existing Deadmon Road Booster Pump Station, located at the intersection of Deadmon Road (SR-1801) and Turrentine Church Road (SR-1802). The project involves the construction of a new booster pump station building with two 50-horsepower centrifugal pumps, electrical work, piping, HVAC, SCADA integration, and demolition of the old station. Sealed bids will be accepted until February 19, 2026, at 10:00 AM at the Davie County Commissioner's Conference Room in Mocksville, NC.
Posted Date
Jan 13, 2026
Due Date
Feb 19, 2026
Release: Jan 13, 2026
Close: Feb 19, 2026
Davie County Public Utilities is seeking bids for the replacement of the existing Deadmon Road Booster Pump Station, located at the intersection of Deadmon Road (SR-1801) and Turrentine Church Road (SR-1802). The project involves the construction of a new booster pump station building with two 50-horsepower centrifugal pumps, electrical work, piping, HVAC, SCADA integration, and demolition of the old station. Sealed bids will be accepted until February 19, 2026, at 10:00 AM at the Davie County Commissioner's Conference Room in Mocksville, NC.
AvailableWork consist of 8" dia DIP, furnishing and installing water mains, including fittings, thrust restraint, excavation and backfill, temporary pavement, permanent pavement within trench limits, and surface restoration, 6" dia DIP, 8" dia mechanical joint gate valves, 6" diameter mechanical joint gate valves, installation of new hydrant, tee, valve and branch piping, relocation of existing fire hydrant, including new tee, valve, and branch piping, hydrostatic pressure testing of water mains, disinfection and bacterial testing of water mains. See attached file.
Posted Date
Jan 8, 2026
Due Date
Feb 10, 2026
Release: Jan 8, 2026
Close: Feb 10, 2026
Work consist of 8" dia DIP, furnishing and installing water mains, including fittings, thrust restraint, excavation and backfill, temporary pavement, permanent pavement within trench limits, and surface restoration, 6" dia DIP, 8" dia mechanical joint gate valves, 6" diameter mechanical joint gate valves, installation of new hydrant, tee, valve and branch piping, relocation of existing fire hydrant, including new tee, valve, and branch piping, hydrostatic pressure testing of water mains, disinfection and bacterial testing of water mains. See attached file.
Work includes 1 LS furnish and install storm water pollution prevention plan; 1 LS furnish and implement trench safety system; 1 LS construction of new booster pump station building; 1 LS furnish and install new booster pumps and all related appurtenances; 1 LS furnish and install all site piping, valves, fittings, bedding, and related work to connect the existing welded steel tank to the existing potable water system; 1 LS furnish and install all site electrical for pump station and miscellaneous items. See attached file.
Posted Date
-
Due Date
Feb 2, 2026
Close: Feb 2, 2026
Work includes 1 LS furnish and install storm water pollution prevention plan; 1 LS furnish and implement trench safety system; 1 LS construction of new booster pump station building; 1 LS furnish and install new booster pumps and all related appurtenances; 1 LS furnish and install all site piping, valves, fittings, bedding, and related work to connect the existing welded steel tank to the existing potable water system; 1 LS furnish and install all site electrical for pump station and miscellaneous items. See attached file.
Work consists of Sewer and Drain Pump Station Wet Well Cleaning.
Posted Date
Jan 22, 2026
Due Date
Feb 5, 2026
Release: Jan 22, 2026
Close: Feb 5, 2026
Work consists of Sewer and Drain Pump Station Wet Well Cleaning.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis