Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The City of Miramar issued an Invitation for Bids (IFB-26-010-0-2026/MAR) for the West Water Treatment Plant Capacity Expansion and Upgrades - Offsite Pipeline, seeking installation of a 20-inch raw water main and an 8-inch force main using horizontal directional drilling over ~2,750 linear feet. The solicitation is an active construction IFB (not a grant) with non-mandatory Webex pre-bid and site-visit scheduled for January 8, 2026, and documents (Technical Specs, Geotechnical Report, Design Plans, Solicitation) listed on the distributor page. Bids open 2025-12-22 and close 2026-01-22; the posting was distributed via DemandStar and no buyer-hosted posting was found during research, so the DemandStar listing is used as the source URL.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Release: Jan 2, 2026
Close: Feb 3, 2026
WWTP Expansion & Major Upgrades.
AvailableRequesting Proposal for Construction Manager at Risk. Project consists of improvements to the existing filtration and backwash system, baffling of the chlorine contact basin, zone 1/ zone 2 pumping capacity and associated electrical upgrades, and expansion of the powdered active carbon slurry system.
Posted Date
Nov 20, 2025
Due Date
Jan 16, 2026
Release: Nov 20, 2025
Close: Jan 16, 2026
Requesting Proposal for Construction Manager at Risk. Project consists of improvements to the existing filtration and backwash system, baffling of the chlorine contact basin, zone 1/ zone 2 pumping capacity and associated electrical upgrades, and expansion of the powdered active carbon slurry system.
AvailableProject includes the construction of a new trickling filter structure, expansion of the disinfection contact basin, mechanical and electrical equipment upgrades, and rehabilitation of the solids holding tank.
Posted Date
Dec 16, 2025
Due Date
Jan 20, 2026
Release: Dec 16, 2025
Close: Jan 20, 2026
Project includes the construction of a new trickling filter structure, expansion of the disinfection contact basin, mechanical and electrical equipment upgrades, and rehabilitation of the solids holding tank.
AvailableCity of Hinesville seeks Construction Management at Risk Services for the expansion and upgrade of its Water Reclamation Facility from 2.0 MGD to 4.0 MGD, including force main installation and various WRF component upgrades.
Posted Date
-
Due Date
Feb 4, 2026
Release: -
Close: Feb 4, 2026
City of Hinesville seeks Construction Management at Risk Services for the expansion and upgrade of its Water Reclamation Facility from 2.0 MGD to 4.0 MGD, including force main installation and various WRF component upgrades.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis