Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Layton City (City of Layton) is soliciting bids for two West Hill Field Road infrastructure projects including widening, asphalt, curb & gutter, sidewalk, storm drain, manholes, conduit, and a secondary water line between 2700 West and 3200 West. Bids must be submitted electronically via QuestCDN/VirtuBid, require a 5% bid bond submitted through QuestCDN, and contractors must submit a Contractor's Qualification Statement for approval by January 16, 2026. Bids are due at 10:00 AM local time on January 22, 2026, and the contract will be awarded to the lowest responsible and responsive bidder.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Requesting bids from qualified professional engineering firms to provide design and bidding support services for a concrete sidewalk project along 7000 South, from 2700 West to 2400 West, in West Jordan.
Posted Date
-
Due Date
Jan 21, 2026
Close: Jan 21, 2026
Requesting bids from qualified professional engineering firms to provide design and bidding support services for a concrete sidewalk project along 7000 South, from 2700 West to 2400 West, in West Jordan.
AvailableWork includes signing and striping 1 ls, clearing and grubbing 1 ls, remove existing tree 6 ea, remove asphalt concrete pavement 19160 sf, remove concrete facility 4770 sf, remove existing fence 910 lf, remove existing guardrail 120 lf, remove existing bollard 5 ea, remove existing cmu headwall 1 ea, remove existing catch basin 1 ea, remove existing 24 cmp 14 lf, relocate existing lvmwd water meter 1 ea, relocate existing traffic signal interconnect 1 ls, relocate existing caltrans electrical conduit 1 ls, relocate existing storage container 2 ea, adjust to grade existing manhole cover 1 ea, adjust to grade existing water valve cover 3 ea, see outside link.
Posted Date
Nov 25, 2025
Due Date
Jan 16, 2026
Release: Nov 25, 2025
Close: Jan 16, 2026
Work includes signing and striping 1 ls, clearing and grubbing 1 ls, remove existing tree 6 ea, remove asphalt concrete pavement 19160 sf, remove concrete facility 4770 sf, remove existing fence 910 lf, remove existing guardrail 120 lf, remove existing bollard 5 ea, remove existing cmu headwall 1 ea, remove existing catch basin 1 ea, remove existing 24 cmp 14 lf, relocate existing lvmwd water meter 1 ea, relocate existing traffic signal interconnect 1 ls, relocate existing caltrans electrical conduit 1 ls, relocate existing storage container 2 ea, adjust to grade existing manhole cover 1 ea, adjust to grade existing water valve cover 3 ea, see outside link.
Procurement for pavement mill and overlay, curb and gutter, storm sewer, sidewalk, entrances, retaining walls, guardrail, pavement marking, signing, and ADA improvements for West Watson Rd / Rott Rd from Weber Hill Road to Robyn Rd.
Posted Date
-
Due Date
Feb 5, 2026
Close: Feb 5, 2026
Procurement for pavement mill and overlay, curb and gutter, storm sewer, sidewalk, entrances, retaining walls, guardrail, pavement marking, signing, and ADA improvements for West Watson Rd / Rott Rd from Weber Hill Road to Robyn Rd.
AvailableInstallation of approximately 1,880 linear feet of 8-inch PVCO water main and 15 linear feet of 8-inch ductile iron water main and appurtenances at #2024 West Henrietta Road, Town of Brighton.
Posted Date
Jan 6, 2026
Due Date
Jan 20, 2026
Release: Jan 6, 2026
Close: Jan 20, 2026
Installation of approximately 1,880 linear feet of 8-inch PVCO water main and 15 linear feet of 8-inch ductile iron water main and appurtenances at #2024 West Henrietta Road, Town of Brighton.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis