Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes signing and striping 1 ls, clearing and grubbing 1 ls, remove existing tree 6 ea, remove asphalt concrete pavement 19160 sf, remove concrete facility 4770 sf, remove existing fence 910 lf, remove existing guardrail 120 lf, remove existing bollard 5 ea, remove existing cmu headwall 1 ea, remove existing catch basin 1 ea, remove existing 24 cmp 14 lf, relocate existing lvmwd water meter 1 ea, relocate existing traffic signal interconnect 1 ls, relocate existing caltrans electrical conduit 1 ls, relocate existing storage container 2 ea, adjust to grade existing manhole cover 1 ea, adjust to grade existing water valve cover 3 ea, see outside link.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Engineering services in connection with the stillwagon road water improvements project.
Posted Date
Nov 27, 2025
Due Date
Jan 9, 2026
Release: Nov 27, 2025
Close: Jan 9, 2026
Engineering services in connection with the stillwagon road water improvements project.
AvailableRelease: Nov 8, 2025
Close: Dec 17, 2025
Road improvements.
AvailableConstruction of roadway improvements, including a multi-use path, pavement widening, curb and gutter, curb ramps, and drainage structures for the West Meyer Road Shouldering Project in St. Charles County, Missouri.
Posted Date
Dec 10, 2025
Due Date
Jan 5, 2026
Release: Dec 10, 2025
Close: Jan 5, 2026
Construction of roadway improvements, including a multi-use path, pavement widening, curb and gutter, curb ramps, and drainage structures for the West Meyer Road Shouldering Project in St. Charles County, Missouri.
AvailableThe project involves drainage, paving, and water line improvements to west katy subdivision in the city of. Improvements include the installation of storm sewer pipe sizes ranging from 18" to 72" , junction boxes, asphalt milling and overlay, concrete panel replacements, and all labor, materials and equipment required to perform the work
Posted Date
Nov 20, 2025
Due Date
Dec 11, 2025
Release: Nov 20, 2025
Close: Dec 11, 2025
The project involves drainage, paving, and water line improvements to west katy subdivision in the city of. Improvements include the installation of storm sewer pipe sizes ranging from 18" to 72" , junction boxes, asphalt milling and overlay, concrete panel replacements, and all labor, materials and equipment required to perform the work
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis