Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Approx 8,900 SY Remove Bituminous Pavement; 4,700 LF Concrete Curb and Gutter; 4,450 CY Excavation – Common (P); 1,900 CY Aggregate Base Class 5; 2,100 TON Type SP 12.5 Wearing Course Mix (3,C); etc.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Project involves the construction of improvements to Griffith Lake Dam located in Kent and Sussex Counties. The improvements include, but are not limited to _Demolition/removal of the existing spillway and the north and south abutment training walls; construction of new pile supported cast-in-place concrete spillway, runout apron, outlet structure and abutment walls; installation of a galvanized steel bar screen trash rack and a multi-leaf self-contained stainless steel weir gate and associated site work.
Posted Date
Nov 10, 2025
Due Date
Jan 21, 2026
Release: Nov 10, 2025
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project involves the construction of improvements to Griffith Lake Dam located in Kent and Sussex Counties. The improvements include, but are not limited to _Demolition/removal of the existing spillway and the north and south abutment training walls; construction of new pile supported cast-in-place concrete spillway, runout apron, outlet structure and abutment walls; installation of a galvanized steel bar screen trash rack and a multi-leaf self-contained stainless steel weir gate and associated site work.
AvailableClose: Jan 19, 2026
Provide tenant improvements. See outside link.
AvailableUsing existing coffer berms around spillways 4 and 5, as well as the interior of cell 2 as borrow, raise approx. 2,000 LF of the low spots on the west portion of cell 2 to el. 46' where crest heights range from approx. EL. 37' to el. 45' and corresponds with approx. stations 190+00 to 210+00; raising a few bents of the timber cribbing structures associated with the outfall pipe for spillway 4; repairs to straighten spillways 4 and 5 will consist of deconstructing the riser structures, removing the footing, removing the catwalk, re-grading the bump-out to a 3H:1V slope, prepping the subgrade, pouring a 16" footing and reconstructing the riser structure.
Posted Date
Jan 12, 2026
Due Date
Jan 26, 2026
Release: Jan 12, 2026
Close: Jan 26, 2026
Using existing coffer berms around spillways 4 and 5, as well as the interior of cell 2 as borrow, raise approx. 2,000 LF of the low spots on the west portion of cell 2 to el. 46' where crest heights range from approx. EL. 37' to el. 45' and corresponds with approx. stations 190+00 to 210+00; raising a few bents of the timber cribbing structures associated with the outfall pipe for spillway 4; repairs to straighten spillways 4 and 5 will consist of deconstructing the riser structures, removing the footing, removing the catwalk, re-grading the bump-out to a 3H:1V slope, prepping the subgrade, pouring a 16" footing and reconstructing the riser structure.
AvailableProcurement for the removal and replacement of a generator, ATS, two submersible pumps, control panel, and associated conduits, wire, and concrete pad for Sawmill West PS Improvements.
Posted Date
Jan 2, 2026
Due Date
Feb 13, 2026
Release: Jan 2, 2026
Close: Feb 13, 2026
Procurement for the removal and replacement of a generator, ATS, two submersible pumps, control panel, and associated conduits, wire, and concrete pad for Sawmill West PS Improvements.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →