Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Procurement for the removal and replacement of a generator, ATS, two submersible pumps, control panel, and associated conduits, wire, and concrete pad for Sawmill West PS Improvements.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The Project consists of removing and replacing the existing generator, ATS, two submersible pumps, control panel and associated conduits, wire and concrete pad.
Posted Date
Jan 2, 2026
Due Date
Feb 13, 2026
Release: Jan 2, 2026
Close: Feb 13, 2026
The Project consists of removing and replacing the existing generator, ATS, two submersible pumps, control panel and associated conduits, wire and concrete pad.
AvailableTraffic signal improvements project.
Posted Date
Jan 12, 2026
Due Date
Feb 26, 2026
Release: Jan 12, 2026
Close: Feb 26, 2026
Traffic signal improvements project.
AvailableThis RFP is for the complete replacement of a final effluent pumping station, replacement of secondary clarifier mechanisms, piping improvements, site grading and landscaping, and associated structural and electrical work at the West Point Treatment Plant.
Posted Date
-
Due Date
Feb 19, 2026
Close: Feb 19, 2026
This RFP is for the complete replacement of a final effluent pumping station, replacement of secondary clarifier mechanisms, piping improvements, site grading and landscaping, and associated structural and electrical work at the West Point Treatment Plant.
AvailableUC Davis is soliciting bids to construct open‑space improvements that create an agricultural buffer around the West Village neighborhood. The scope includes a meandering gravel walking path, irrigation infrastructure, soil relocation, fencing, storm‑water basins, and roughly 4.75‑15 acres of native plantings to support habitat and storm‑water management. The project is led by UC Davis Design and Construction Management with environmental documentation referenced by UC Davis Environmental Planning and CEQAnet.
Posted Date
-
Due Date
Jan 21, 2026
Release: -
Close: Jan 21, 2026
UC Davis is soliciting bids to construct open‑space improvements that create an agricultural buffer around the West Village neighborhood. The scope includes a meandering gravel walking path, irrigation infrastructure, soil relocation, fencing, storm‑water basins, and roughly 4.75‑15 acres of native plantings to support habitat and storm‑water management. The project is led by UC Davis Design and Construction Management with environmental documentation referenced by UC Davis Environmental Planning and CEQAnet.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →