Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide tenant improvements. See outside link.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work includes complete reconfiguration of interior floor plan, including new courtrooms, meeting rooms, restrooms. New build-out will consist of non-load bearing interior partitions, suspended ceiling systems, floor and wall finishes, casework, HVAC, fire protection, electrical and plumbing. Exterior alterations to the south and south/west exterior facade. New intake & exhaust louvers, remove existing exterior door, infill existing opening to match existing facade, and replace existing exterior windows with level 3 ballistic windows.
Posted Date
Dec 11, 2025
Due Date
Jan 28, 2026
Release: Dec 11, 2025
Close: Jan 28, 2026
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes complete reconfiguration of interior floor plan, including new courtrooms, meeting rooms, restrooms. New build-out will consist of non-load bearing interior partitions, suspended ceiling systems, floor and wall finishes, casework, HVAC, fire protection, electrical and plumbing. Exterior alterations to the south and south/west exterior facade. New intake & exhaust louvers, remove existing exterior door, infill existing opening to match existing facade, and replace existing exterior windows with level 3 ballistic windows.
AvailableTenant #6 buildout; tenant #6 furniture; b401 dry coooler.
Posted Date
Jan 6, 2026
Due Date
Feb 10, 2026
Release: Jan 6, 2026
Close: Feb 10, 2026
Tenant #6 buildout; tenant #6 furniture; b401 dry coooler.
AvailableApprox 8,900 SY Remove Bituminous Pavement; 4,700 LF Concrete Curb and Gutter; 4,450 CY Excavation – Common (P); 1,900 CY Aggregate Base Class 5; 2,100 TON Type SP 12.5 Wearing Course Mix (3,C); etc.
Posted Date
Dec 27, 2025
Due Date
Jan 21, 2026
Release: Dec 27, 2025
Close: Jan 21, 2026
Approx 8,900 SY Remove Bituminous Pavement; 4,700 LF Concrete Curb and Gutter; 4,450 CY Excavation – Common (P); 1,900 CY Aggregate Base Class 5; 2,100 TON Type SP 12.5 Wearing Course Mix (3,C); etc.
AvailablePavement Rehab Project on Manchester Xing and Danbury Bay.
Posted Date
Jan 8, 2026
Due Date
Jan 23, 2026
Release: Jan 8, 2026
Close: Jan 23, 2026
Pavement Rehab Project on Manchester Xing and Danbury Bay.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →