Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Dam Construction.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Major items of work include: Unwater the reservoir and dewater the construction area. Excavate the existing dam embankment and foundation to remove the existing outlet works structures and construct the new outlet works. Reconstruct the dam embankment Construct a toe drain system consisting of drainpipes, precast concrete manholes, flow measurement flumes, and imported sand and gravel. Construct new outlet works Excavation and grading the spillway Place imported road gravel surfacing along the crest of the dam Reclaim (prep soil and seeding) all disturbed areas, including construction staging areas and temporary road.
Posted Date
Apr 16, 2025
Due Date
Jan 7, 2026
Release: Apr 16, 2025
Close: Jan 7, 2026
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Major items of work include: Unwater the reservoir and dewater the construction area. Excavate the existing dam embankment and foundation to remove the existing outlet works structures and construct the new outlet works. Reconstruct the dam embankment Construct a toe drain system consisting of drainpipes, precast concrete manholes, flow measurement flumes, and imported sand and gravel. Construct new outlet works Excavation and grading the spillway Place imported road gravel surfacing along the crest of the dam Reclaim (prep soil and seeding) all disturbed areas, including construction staging areas and temporary road.
AvailableMajor work items include: Dewater reservoir and construction area. Excavate a portion of the existing dam embankment and foundation to remove the existing outlet works pipe and allow construction of the new outlet works. Reconstruct the dam embankment, including. Construct precast concrete outlet works riser for a new outlet works. Construct concrete encased, precast reinforced concrete pipe outlet works conduit. Construct precast concrete low-level outlet works inlet structure and concrete encased PVC pipe conduit. Construct grouted riprap outlet works stilling basin. Excavation, fill, and grading for new auxiliary spillway. Place gravel road surfacing within specified limits on the crest of the dam. Reclaim all disturbed areas including staging areas and temporary roads. Reclamation consists of preparation of soil and seeding.
Posted Date
Jun 5, 2025
Due Date
Jan 14, 2026
Release: Jun 5, 2025
Close: Jan 14, 2026
Major work items include: Dewater reservoir and construction area. Excavate a portion of the existing dam embankment and foundation to remove the existing outlet works pipe and allow construction of the new outlet works. Reconstruct the dam embankment, including. Construct precast concrete outlet works riser for a new outlet works. Construct concrete encased, precast reinforced concrete pipe outlet works conduit. Construct precast concrete low-level outlet works inlet structure and concrete encased PVC pipe conduit. Construct grouted riprap outlet works stilling basin. Excavation, fill, and grading for new auxiliary spillway. Place gravel road surfacing within specified limits on the crest of the dam. Reclaim all disturbed areas including staging areas and temporary roads. Reclamation consists of preparation of soil and seeding.
The West Virginia Purchasing Division, on behalf of the West Virginia Conservation Agency, is soliciting construction services to rehabilitate Brush Creek Site 15 Dam in Mercer County, WV; scope includes clearing and grubbing, structure removal, spillway and embankment rehabilitation, erosion and sediment controls, and associated civil/geotechnical work. The solicitation is an open state CRFQ with a mandatory pre-bid event noted in procurement documents and a final bid due on January 7, 2026.
Posted Date
Sep 30, 2025
Due Date
Jan 7, 2026
Release: Sep 30, 2025
Close: Jan 7, 2026
The West Virginia Purchasing Division, on behalf of the West Virginia Conservation Agency, is soliciting construction services to rehabilitate Brush Creek Site 15 Dam in Mercer County, WV; scope includes clearing and grubbing, structure removal, spillway and embankment rehabilitation, erosion and sediment controls, and associated civil/geotechnical work. The solicitation is an open state CRFQ with a mandatory pre-bid event noted in procurement documents and a final bid due on January 7, 2026.
The U.S. Army Corps of Engineers (USACE) Philadelphia District issued a Combined Synopsis/Solicitation for the Blue Marsh Dam Emergency Generator design‑build construction project to design and install an emergency generator system at Blue Marsh Dam. The opportunity is a Total Small Business Set‑Aside under NAICS 236220 and includes construction, electrical integration, and compliance with safety and environmental regulations. The posting is active, publicly listed on SAM.gov, and proposals are due Feb 4, 2026 at 3:00 p.m. EST.
Posted Date
Dec 17, 2025
Due Date
Feb 4, 2026
Release: Dec 17, 2025
Close: Feb 4, 2026
The U.S. Army Corps of Engineers (USACE) Philadelphia District issued a Combined Synopsis/Solicitation for the Blue Marsh Dam Emergency Generator design‑build construction project to design and install an emergency generator system at Blue Marsh Dam. The opportunity is a Total Small Business Set‑Aside under NAICS 236220 and includes construction, electrical integration, and compliance with safety and environmental regulations. The posting is active, publicly listed on SAM.gov, and proposals are due Feb 4, 2026 at 3:00 p.m. EST.