Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Drill, construct, and test a 16" production well to an estimated depth of 1,200' at the Oakbrook Wellfield using reverse circulation mud rotary drilling methods.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Well #6 Well House Rehabilitation. The Project generally includes: the rehabilitation of the well, the installation of an emergency power source (backup generator), building upgrades, electrical upgrades, general site work, the installation of a concrete loading dock, the supply and installation of new valves, piping, and chemical feed equipment, as well as associated equipment and appurtenances.
Posted Date
Jan 7, 2026
Due Date
Feb 5, 2026
Release: Jan 7, 2026
Close: Feb 5, 2026
Well #6 Well House Rehabilitation. The Project generally includes: the rehabilitation of the well, the installation of an emergency power source (backup generator), building upgrades, electrical upgrades, general site work, the installation of a concrete loading dock, the supply and installation of new valves, piping, and chemical feed equipment, as well as associated equipment and appurtenances.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Installation of the deep well submersible pump assemblies within an existing 13 3/8 o. D. Well casings at the g-80 point of diversions (pods) #8 and #13 well. Work for this project shall include 4 1/2" o. D. J-55 steel column piping, check valves, electric cable, stainless steel air lines, centralizers and appurtenances. The project also includes the construction of a new well heads with well disinfection pod #13 only, start up, and coordination with other contractors at each well.
Posted Date
Dec 26, 2025
Due Date
Jan 28, 2026
Release: Dec 26, 2025
Close: Jan 28, 2026
Installation of the deep well submersible pump assemblies within an existing 13 3/8 o. D. Well casings at the g-80 point of diversions (pods) #8 and #13 well. Work for this project shall include 4 1/2" o. D. J-55 steel column piping, check valves, electric cable, stainless steel air lines, centralizers and appurtenances. The project also includes the construction of a new well heads with well disinfection pod #13 only, start up, and coordination with other contractors at each well.
AvailableProject consists of construction of Public Water Supply Well No. 5, and the Well No. 5 Pumphouse, completion of SCADA system updates, abandonment of Well No. 2, and demolition of the Well No. 2 Pumphouse. Contract A - Public Water Supply Well No. 5: Construction of a 1,200 gallon per minute (gpm) municipal well to a depth of 106 feet, well development, performance pump testing of constructed well, WDNR NR 809 water quality analysis, erosion control restoration of the work area, and other miscellaneous items in conformance with the Contract Documents. Contract B - Well No. 5 Pumphouse, SCADA Updates & Demolition of Well No. 2 Pumphouse: Construction of the Well No. 5 Pumphouse building, including furnishing and installing all well pump equipment, piping, valves, accessories and controls. The building includes a pump room, chemical room, and restroom. The Well No. 5 Pumphouse contract also includes installation of a natural gas-powered emergency electrical generator, erosion control measures, site work, site piping, driveway, pavement, restoration of the work area, pump testing, water quality testing, and other miscellaneous items in conformance with the Contract Documents. Also, to include demolition of the Well No. 2 Pumphouse including building demolition, excavation, water main and other utilities disconnections/abandonments, backfilling, grading, and site restoration. The existing Well No. 2 motor control center and well pump equipment are to be salvaged and reused in the proposed Well No. 5 Pumphouse. Well No. 2 is to be abandoned including removal and off-site disposal, or salvaging for the Owner, of existing well pump, column pipe, electrical cables, and motor, removing the casing to 3 feet below final finish grade, filling with concrete, neat cement grout or approved bentonite chips, and submitting a Well/Drillhole Abandonment Report. In addition, the project includes SCADA system updates which include removal and disposal of existing SCADA system equipment and installation of new equipment at the existing Well Nos. 1, 3, & 4, pumphouses, reservoirs site, and the proposed Well No. 5 Pumphouse.
Posted Date
Jan 8, 2026
Due Date
Feb 10, 2026
Release: Jan 8, 2026
Close: Feb 10, 2026
Project consists of construction of Public Water Supply Well No. 5, and the Well No. 5 Pumphouse, completion of SCADA system updates, abandonment of Well No. 2, and demolition of the Well No. 2 Pumphouse. Contract A - Public Water Supply Well No. 5: Construction of a 1,200 gallon per minute (gpm) municipal well to a depth of 106 feet, well development, performance pump testing of constructed well, WDNR NR 809 water quality analysis, erosion control restoration of the work area, and other miscellaneous items in conformance with the Contract Documents. Contract B - Well No. 5 Pumphouse, SCADA Updates & Demolition of Well No. 2 Pumphouse: Construction of the Well No. 5 Pumphouse building, including furnishing and installing all well pump equipment, piping, valves, accessories and controls. The building includes a pump room, chemical room, and restroom. The Well No. 5 Pumphouse contract also includes installation of a natural gas-powered emergency electrical generator, erosion control measures, site work, site piping, driveway, pavement, restoration of the work area, pump testing, water quality testing, and other miscellaneous items in conformance with the Contract Documents. Also, to include demolition of the Well No. 2 Pumphouse including building demolition, excavation, water main and other utilities disconnections/abandonments, backfilling, grading, and site restoration. The existing Well No. 2 motor control center and well pump equipment are to be salvaged and reused in the proposed Well No. 5 Pumphouse. Well No. 2 is to be abandoned including removal and off-site disposal, or salvaging for the Owner, of existing well pump, column pipe, electrical cables, and motor, removing the casing to 3 feet below final finish grade, filling with concrete, neat cement grout or approved bentonite chips, and submitting a Well/Drillhole Abandonment Report. In addition, the project includes SCADA system updates which include removal and disposal of existing SCADA system equipment and installation of new equipment at the existing Well Nos. 1, 3, & 4, pumphouses, reservoirs site, and the proposed Well No. 5 Pumphouse.
AvailableConstruction of well rehabilitation. The work for which proposals are invited consists of pulling and inspecting the pump, pump motor, and bowl assembly, televising the well, assessing the condition of the well equipment, and a report detailing recommended improvements.
Posted Date
Dec 30, 2025
Due Date
Jan 22, 2026
Release: Dec 30, 2025
Close: Jan 22, 2026
Construction of well rehabilitation. The work for which proposals are invited consists of pulling and inspecting the pump, pump motor, and bowl assembly, televising the well, assessing the condition of the well equipment, and a report detailing recommended improvements.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →