Open RFP

Well No. 3 Water Treatment Plant (WTP) Rehabilitation RFP

Description: Rehabilitate the existing WTP as shown in the contract documents. The proposed project generally consists of the removal and replacement of the existing ion exchange system, forced draft aerator, brine dilution system, fluoride feed system, phosphate feed system, chlorine feed system, process piping, and booster pumps. Project also includes brine tank hatch repair as detailed in contract documents, the installation of a new prefabricated chlorine and scrubber building with an emergency chlorine gas scrubber, installation of an emergency standby generator and all associated electrical and controls, demolition, erosion control, site grading, restoration, asphalt paving, building improvements, partial roof removal and replacement, and all other miscellaneous work

Buyer
Released
Aug 10, 2025
Closes
Jan 6, 2027(50 days left)
See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
See your top 10 accounts