Retrieving RFP details
Release
Close
City of West Richland
100 LF drill 24" borehole, 100 LF furnish and install 20" conductor casing, 5 CY furnish and install formation cement grout seal, 300 LF drill 20" borehole, 403 LF furnish and install 16" production casing, 20 CY furnish and install permanent formation cement grout seal.
W-155A - CONTRACT DOCUMENTS - 10-20-2025
South Carolina Department of Natural Resources
Provide drilling an 600' deep well with a 2HP setup.
Jacksonville Electric Authority (JEA) - Procurement Dept
Provide Well No. 1 and Well No. 2 shall be drilled into the Floridan aquifer containing fresh water under pressure. Clear the Well No. 1 and 2 site (clearing, stripping, grubbing and disposal). Stabilization, clearing, grubbing, and maintenance of existing road.
Town of Harrah
Construction of a new potable water well to provide a source of groundwater for municipal use. The well will be constructed to obtain the greatest possible yield (approx. 500 gpm) within the limits of well depth (approx. 540 LF) and diameter. The well will be drilled through unconsolidated and consolidated formations using rotary drilling methods. Well construction will include a surface seal, grouting, casing, well screen, development, disinfection, pumping tests, and site cleanup. Schedule A includes drilling and preliminary drill stem well yield testing to 500 LF below ground surface. If desired flow rates are achieved at 500 LF below ground surface, work may continue to include Schedule B. Otherwise, the well may be drilled to an approximate depth of 1,050 LF as outlined in Additive Schedule C.
Release
Oct 21, 2025
Close
Nov 12, 2025