Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Construction of a water plant, to include: one (1) bolted steel water tank, one (1) hydropneumatic tank, booster pump station, chlorination system, electrical service, electrical controls, paving, drainage, yard piping, fence, and all other necessary appurtenances.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The Owner, Fort Bend County Municipal Utility District No. 134E, is soliciting sealed bids for construction of Harvest Green Water Plant No. 1 - Phase 2 in Fort Bend County, Texas. The project includes a 635,000‑gallon concrete ground storage tank, a 20,000‑gallon hydropneumatic tank, a 1,000 gpm booster pump, standby generator, plant piping, electrical/control work, coatings, and site‑related work for a fully functional facility. Bids are due on February 12, 2026, at 10:00 AM CST at Quiddity Engineering’s office in Bellaire, TX (and/or electronically via CivCast).
Posted Date
-
Due Date
Feb 12, 2026
Close: Feb 12, 2026
The Owner, Fort Bend County Municipal Utility District No. 134E, is soliciting sealed bids for construction of Harvest Green Water Plant No. 1 - Phase 2 in Fort Bend County, Texas. The project includes a 635,000‑gallon concrete ground storage tank, a 20,000‑gallon hydropneumatic tank, a 1,000 gpm booster pump, standby generator, plant piping, electrical/control work, coatings, and site‑related work for a fully functional facility. Bids are due on February 12, 2026, at 10:00 AM CST at Quiddity Engineering’s office in Bellaire, TX (and/or electronically via CivCast).
AvailableSeeks bids from qualified firms for general construction services related to the water treatment plant feeder channel dredging. Project will entail mechanical dredging of the water treatment plant feeder channel, which is necessary to maintain the treatment plant's optimal capacity for water delivery.
Posted Date
Jan 9, 2026
Due Date
Feb 2, 2026
Release: Jan 9, 2026
Close: Feb 2, 2026
Seeks bids from qualified firms for general construction services related to the water treatment plant feeder channel dredging. Project will entail mechanical dredging of the water treatment plant feeder channel, which is necessary to maintain the treatment plant's optimal capacity for water delivery.
AvailableWork includes mass grading of the site to accommodate a future 40 million gallons per day (mgd) water treatment plant (wtp), mass grading of the existing site per the 40 mgd layout; erosion and sedimentation control; site work demolition; yard structure demolition; detention pond construction; site restoration.
Posted Date
Jan 21, 2026
Due Date
Feb 11, 2026
Release: Jan 21, 2026
Close: Feb 11, 2026
Work includes mass grading of the site to accommodate a future 40 million gallons per day (mgd) water treatment plant (wtp), mass grading of the existing site per the 40 mgd layout; erosion and sedimentation control; site work demolition; yard structure demolition; detention pond construction; site restoration.
AvailableWork includes water supply plant no. 1, ATS and generator replacement.
Posted Date
Jan 22, 2026
Due Date
Feb 10, 2026
Release: Jan 22, 2026
Close: Feb 10, 2026
Work includes water supply plant no. 1, ATS and generator replacement.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis