Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Contact phone number for this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Synthesizing live web signals with exclusive contracts, FOIA docs, and board-level intelligence.
Ask a question to get started or click a suggestion below.
Search across Fort Bend County Mud 134e's meeting minutes, FOIA documents, procurement records, and public filings. Our AI reads thousands of sources so you don't have to.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
Active opportunities open for bidding
Fort Bend County Mud 134e
Construction services for water, sanitary sewer, storm sewer facilities, and reinforced concrete paving in Harris County MUD No. 458.
Posted Date
-
Due Date
Feb 3, 2026
Fort Bend County Mud 134e
Close: Feb 3, 2026
Construction services for water, sanitary sewer, storm sewer facilities, and reinforced concrete paving in Harris County MUD No. 458.
AvailableFort Bend County Mud 134e
Construction of harvest green square water line, sanitary sewer, storm sewer facilities, and reinforced concrete paving, approx. 1,700 LF waterline; approx. 1,100 LF sanitary; approx. 2,000 LF storm sewer utilities; approx. 900 LF right turn deceleration lane; two left turn lanes with median opening.
Posted Date
-
Due Date
Jan 27, 2026
Fort Bend County Mud 134e
Close: Jan 27, 2026
Construction of harvest green square water line, sanitary sewer, storm sewer facilities, and reinforced concrete paving, approx. 1,700 LF waterline; approx. 1,100 LF sanitary; approx. 2,000 LF storm sewer utilities; approx. 900 LF right turn deceleration lane; two left turn lanes with median opening.
AvailableFort Bend County Mud 134e
The work consists of construct harvest green lift station nos. 1 and 3 expansions including demolition of three (3) submersible pumps; installation of three (3) submersible pumps and accessories; bypass pumping; protective coatings; site work; wood fencing with gates; natural gas engine generator with sound attenuated weatherproof enclosure; natural gas line and meter, generator slab, underground duct bank, automatic transfer switch and load bank testing; modifications to the existing electrical control panel; electrical service; disconnect switches; conduit; wire.
Posted Date
Aug 28, 2025
Due Date
Sep 16, 2025
Release: Aug 28, 2025
Fort Bend County Mud 134e
Close: Sep 16, 2025
The work consists of construct harvest green lift station nos. 1 and 3 expansions including demolition of three (3) submersible pumps; installation of three (3) submersible pumps and accessories; bypass pumping; protective coatings; site work; wood fencing with gates; natural gas engine generator with sound attenuated weatherproof enclosure; natural gas line and meter, generator slab, underground duct bank, automatic transfer switch and load bank testing; modifications to the existing electrical control panel; electrical service; disconnect switches; conduit; wire.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.