Fuel Farm Improvements At the Colorado Air and Space Port
Works include Fuel Farm Improvements project, 580 LF of 1-2" Sch. 40 PVC Conduit Installed in trench with Conduit Seals; 430 LF of 1-1" Sch. 40 PVC Conduit Installed in Trench with Conduit Seals; 230 LF of Fuel Pump Conductor - (3) #8 AWG CU & (1) #8 AWG GND; 200 LF of Pole Lights Conductor - (2) #12 AWG CU & (1) #12 AWG GND; 220 LF of Emergency Fuel Shutoff Switch Cabling - Cat 6E Cabling; 210 LF of Quad Receptacle Conductor - (3) #12 AWG CU & (1) #12 AWG GND.