West Chester University Of Pennsylvania
Higher EducationPA
Posted
Oct 30, 2026
Nov 20, 2026
WC2608 SWOPE Stormwater Basin Retrofit Project
West Chester University seeks a contractor to retrofit an existing stormwater detention basin at the southeast corner of S High St and E Campus Dr in West Chester, Pennsylvania. Work includes clearing and demolition, erosion and sediment controls, basin regrading, amended soils, an underdrain system, drainage piping, and a gabion basket forebay. The project also replaces the outlet structure and connects its piping to the existing storm sewer within East Campus Drive.
