WC-1091 Waterline Replacement
Waterline replacement. Work includes 1 LS sediment and erosion control; 1 LS clearing and grubbing; 3,066 LF of trench excavation and backfill; 1,065 LF of 8" pipe boring; 42 LF of 8" carrier pipe casing; 49 EA 1" single short service; 62 EA 1" single long service; 5 EA fire hydrant; tapping valve and valve box; 46 LF of DR-14 6" C900 PVC water line pipe; 3,020 DR-14 8" C900 PVC water line pipe; 50 LF of 8" carrier steel casing pipe; 1,212 SY of concrete pavement cut and pavement repair; 82 SY of asphalt pavement cut and pavement repair; 791 SY of 4" remove and replace sidewalk; 107 SY Of 4" curb ramp; 240 SF of tactile warning device; 293 LF of remove and replace curb and gutter; 4,090 SY of solid slab sodding.