Summary
Work consist of 47 sy of sawcut, remove & replace existing ac asphalt, 3 ea of remove & replace existing concrete ada ramp, 527 sf of remove and replace concrete valley gutter, 1 ea of remove existing water valve, 11 ea of remove existing water meter and box, 5 ea of abandon existing water valve, 2,103 lf of install 8" pvc c900 water line, 11 ea of install 8" gate valve, box & cover, 24 ea of install 1" copper water service, 11 ea of install water meter, 11 ea of install water meter box, 1 ea of install fire hydrant assembly, 1,338 sy of alley grading, 1 ea of adjust existing sewer manhole to proposed grade.