Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
This request is for authorization to solicit bids for the relocation and upgrade of fuel tanks, which includes new tank installation, removal of old tanks, backfilling, paving, and restoration.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Procurement of fuel tanks.
Posted Date
Nov 20, 2025
Due Date
Jan 20, 2026
Release: Nov 20, 2025
Close: Jan 20, 2026
Procurement of fuel tanks.
AvailableConstruction services for our fuel system upgrade.
Posted Date
Jan 7, 2026
Due Date
Jan 16, 2026
Release: Jan 7, 2026
Close: Jan 16, 2026
Construction services for our fuel system upgrade.
AvailableExperienced consultants to assist in the completion of a local waterfront revitalization plan (LWRP) for the city.
Posted Date
Jan 2, 2026
Due Date
Jan 30, 2026
Release: Jan 2, 2026
Close: Jan 30, 2026
Experienced consultants to assist in the completion of a local waterfront revitalization plan (LWRP) for the city.
AvailableThis project includes testing of underground and above ground fuel storage tanks, as well as demolition of underground tanks, testing requirements and installation/modification of fuel tank monitoring equipment. The contractor shall initiate testing upon receiving notice to proceed, covering "3 year" tests for underground storage tanks (ust) and "5 year" tests for above ground storage tanks (ast) as specified. Tasks include tank tightness tests, automatic tank gauging functionality, hydrotesting and cleaning of tank sumps and spill containments, and testing overfill valves. Daily cleanup and restoration of work areas to original conditions are mandatory. Comprehensive reports outlining deficiencies, failures, and necessary actions for deq compliance, along with cost estimates for corrective measures, are required. For ust demolition, five diesel tanks shall be excavated, removed, and the site restored, including handling and disposal of contaminated soils and tank materials. Necessary permits, dewatering, shoring, and other expected underground excavation costs must be included in the proposals. See attached file.
Posted Date
Jan 7, 2026
Due Date
Jan 14, 2026
Release: Jan 7, 2026
Close: Jan 14, 2026
This project includes testing of underground and above ground fuel storage tanks, as well as demolition of underground tanks, testing requirements and installation/modification of fuel tank monitoring equipment. The contractor shall initiate testing upon receiving notice to proceed, covering "3 year" tests for underground storage tanks (ust) and "5 year" tests for above ground storage tanks (ast) as specified. Tasks include tank tightness tests, automatic tank gauging functionality, hydrotesting and cleaning of tank sumps and spill containments, and testing overfill valves. Daily cleanup and restoration of work areas to original conditions are mandatory. Comprehensive reports outlining deficiencies, failures, and necessary actions for deq compliance, along with cost estimates for corrective measures, are required. For ust demolition, five diesel tanks shall be excavated, removed, and the site restored, including handling and disposal of contaminated soils and tank materials. Necessary permits, dewatering, shoring, and other expected underground excavation costs must be included in the proposals. See attached file.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis