Special DistrictMS
Posted
Aug 26, 2026
Sep 29, 2026
Water Well #11
Construction of a new 350-gallon-per-minute water well and closure of existing water well number 2.
Description: Construction of a new 350-gallon-per-minute water well and closure of existing water well number 2.
SpecialDistrict · MS, US
Original attachments and procurement documents tied to this bid.
Adjacent opportunities open for bidding right now.
Special DistrictMS
Posted
Aug 26, 2026
Sep 29, 2026
Construction of a new 350-gallon-per-minute water well and closure of existing water well number 2.
Willingboro Municipal Utilities Authority
Special DistrictNJ
Posted
Sep 15, 2026
Sep 18, 2026
Selective demolition of the existing water treatment plant facilities and the furnishing and installation of new pressure filters, filter control building, chemical feed and storage equipment, aerators, solids control clarifiers, chlorine contact chamber, and all associated pumps, piping, electrical, mechanical, and instrumentation and control equipment.
Higher EducationTX
Posted
Sep 9, 2026
Oct 1, 2026
This project will consist of a new domestic water well, water transmission main, cooling tower, and ground storage tank facility is needed to support the campus. The well will be an approximate 3,200-foot deep well providing up to 1,934 ac-ft per year of water at a rate of 2,800 gallons per minute. This well system will connect to a proposed cooling tower and a 500,000-gallon ground storage tank. The ground storage tank will be interconnected to a new 1-million-gallon elevated storage tank (under previously approved sub-project) to supply the campus.
CityIA
Posted
Sep 15, 2026
Oct 15, 2026
Work includes approx. of 315 LF of drilling 20" bore hole; 120 LF of drilling 16" bore hole; 1,700 SACKS of neat cement grout; 335 LF of column pipe; 315 LF of 18" A53 surface casing; 330 LF of 12" A53 inner casing; 120 LF of 2" stainless steel screen.