Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Somerton
Work consists of rehabilitation of filter tanks at water treatment plant. The goal of this project is to restore the filtration system to full operational condition, ensure continued reliability and water quality, and complete all work with minimal disruption to plant operations and water service.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Sheboygan Water Utility
This project includes rehabilitation of three (3) filters including removal of underdrains, media, and surface sweeps and replacement with stainless steel underdrains, new media and surface sweeps. This project also includes the rehabilitation of a section of the roof over the three filters.
Posted Date
Nov 21, 2025
Due Date
Feb 4, 2026
Release: Nov 21, 2025
Sheboygan Water Utility
Close: Feb 4, 2026
This project includes rehabilitation of three (3) filters including removal of underdrains, media, and surface sweeps and replacement with stainless steel underdrains, new media and surface sweeps. This project also includes the rehabilitation of a section of the roof over the three filters.
AvailableVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Town of Ayer
The Work consists of removal and replacement of GAC (Granulated Activated Carbon) media of one (1) existing GAC filter at the Spectacle Pond Water Treatment Plant.
Posted Date
Oct 15, 2025
Due Date
Dec 4, 2025
Release: Oct 15, 2025
Town of Ayer
Close: Dec 4, 2025
The Work consists of removal and replacement of GAC (Granulated Activated Carbon) media of one (1) existing GAC filter at the Spectacle Pond Water Treatment Plant.
AvailableVillage of Barrington
Project consist of Iron Filter Replacement in Water Treatment Plant; see outside links for more details.
Posted Date
Oct 30, 2025
Due Date
Dec 9, 2025
Release: Oct 30, 2025
Village of Barrington
Close: Dec 9, 2025
Project consist of Iron Filter Replacement in Water Treatment Plant; see outside links for more details.
AvailableCity of Amboy
The Project includes the following Work: Addition of pressure filtration to the existing Reverse Osmosis Drinking Water Treatment Plant. Includes piping, valving, pressure filter system, chemical feed systems, electrical and controls.
Posted Date
Nov 21, 2025
Due Date
Dec 17, 2025
Release: Nov 21, 2025
City of Amboy
Close: Dec 17, 2025
The Project includes the following Work: Addition of pressure filtration to the existing Reverse Osmosis Drinking Water Treatment Plant. Includes piping, valving, pressure filter system, chemical feed systems, electrical and controls.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →