Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work consists of rehabilitation of filter tanks at water treatment plant. The goal of this project is to restore the filtration system to full operational condition, ensure continued reliability and water quality, and complete all work with minimal disruption to plant operations and water service.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
This project includes rehabilitation of three (3) filters including removal of underdrains, media, and surface sweeps and replacement with stainless steel underdrains, new media and surface sweeps. This project also includes the rehabilitation of a section of the roof over the three filters.
Posted Date
Nov 21, 2025
Due Date
Feb 4, 2026
Release: Nov 21, 2025
Close: Feb 4, 2026
This project includes rehabilitation of three (3) filters including removal of underdrains, media, and surface sweeps and replacement with stainless steel underdrains, new media and surface sweeps. This project also includes the rehabilitation of a section of the roof over the three filters.
AvailableProvide CMAR for retrofitting the filters at a 28.8 MGD water treatment plant, preconstruction services including design constructability reviews and procurement services. Scope of work includes filter underdrain removal and replacement, removing and patching cast-in-place and grout in filter tanks, filter media removal and disposal, filter GAC media replacement, pipe modifications to facilitate media removal and replacement, non-potable water line for a new yard hydrant located outside the facility, and retrofitting filters to maintain continuity of plant operations.
Posted Date
Dec 25, 2025
Due Date
Jan 23, 2026
Release: Dec 25, 2025
Close: Jan 23, 2026
Provide CMAR for retrofitting the filters at a 28.8 MGD water treatment plant, preconstruction services including design constructability reviews and procurement services. Scope of work includes filter underdrain removal and replacement, removing and patching cast-in-place and grout in filter tanks, filter media removal and disposal, filter GAC media replacement, pipe modifications to facilitate media removal and replacement, non-potable water line for a new yard hydrant located outside the facility, and retrofitting filters to maintain continuity of plant operations.
Concrete rehabilitation of Treatment Building 1 at City of Greeley Bellvue Water Treatment plant.
Posted Date
Dec 18, 2025
Due Date
Jan 29, 2026
Release: Dec 18, 2025
Close: Jan 29, 2026
Concrete rehabilitation of Treatment Building 1 at City of Greeley Bellvue Water Treatment plant.
AvailableThis RFP is for the removal and replacement of the existing 8" diameter reduced-pressure zone with pressure relief valve, gate valves, pressure reducing valves, automatic control valve, and associated plumbing at the Dixon Water Treatment Plant.
Posted Date
Jan 6, 2026
Due Date
Jan 21, 2026
Release: Jan 6, 2026
Close: Jan 21, 2026
This RFP is for the removal and replacement of the existing 8" diameter reduced-pressure zone with pressure relief valve, gate valves, pressure reducing valves, automatic control valve, and associated plumbing at the Dixon Water Treatment Plant.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis