Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project generally consists of the rehabilitation of 12 existing filters.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The project consists of rehabilitating the existing Regional Water Treatment Plant by replacing the existing electrical actuators for the filters and softener process valves, removal of the existing filter and softener media and replacement with new media, rehabilitation of the existing filter and softener vessels, addition of a new waste holding basin, and rehabilitation of the existing waste holding basin circular sludge collection system equipment for Waste Holding Basin #2.
Posted Date
Jan 9, 2026
Due Date
Feb 17, 2026
Release: Jan 9, 2026
Close: Feb 17, 2026
The project consists of rehabilitating the existing Regional Water Treatment Plant by replacing the existing electrical actuators for the filters and softener process valves, removal of the existing filter and softener media and replacement with new media, rehabilitation of the existing filter and softener vessels, addition of a new waste holding basin, and rehabilitation of the existing waste holding basin circular sludge collection system equipment for Waste Holding Basin #2.
AvailableConcrete rehabilitation of Treatment Building 1 at City of Greeley Bellvue Water Treatment plant.
Posted Date
Dec 18, 2025
Due Date
Jan 29, 2026
Release: Dec 18, 2025
Close: Jan 29, 2026
Concrete rehabilitation of Treatment Building 1 at City of Greeley Bellvue Water Treatment plant.
AvailableThis project includes rehabilitation of three (3) filters including removal of underdrains, media, and surface sweeps and replacement with stainless steel underdrains, new media and surface sweeps. This project also includes the rehabilitation of a section of the roof over the three filters.
Posted Date
Nov 21, 2025
Due Date
Feb 4, 2026
Release: Nov 21, 2025
Close: Feb 4, 2026
This project includes rehabilitation of three (3) filters including removal of underdrains, media, and surface sweeps and replacement with stainless steel underdrains, new media and surface sweeps. This project also includes the rehabilitation of a section of the roof over the three filters.
AvailableWater treatment filters maintenance, repair, and inspection services.
Posted Date
Dec 15, 2025
Due Date
Jan 21, 2026
Release: Dec 15, 2025
Close: Jan 21, 2026
Water treatment filters maintenance, repair, and inspection services.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →