Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The City of Pearson, Georgia is requesting bids for Water System Improvements.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Garfield County Rural Water District #6 is soliciting sealed bids for Water System Improvements, to be received at the District office in Garber, Oklahoma. Bids are due by 2:00 p.m. on January 29, 2026, and all official notifications and bidding documents are available via the designated bidding website, CivCast. The project is advertised via legal notice in the Enid News & Eagle with publications on January 8 and January 15, 2026.
Posted Date
Jan 8, 2026
Due Date
Jan 29, 2026
Release: Jan 8, 2026
Close: Jan 29, 2026
Garfield County Rural Water District #6 is soliciting sealed bids for Water System Improvements, to be received at the District office in Garber, Oklahoma. Bids are due by 2:00 p.m. on January 29, 2026, and all official notifications and bidding documents are available via the designated bidding website, CivCast. The project is advertised via legal notice in the Enid News & Eagle with publications on January 8 and January 15, 2026.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work consists of construction of a fire protection water system water storage tank improvements.
Posted Date
Dec 9, 2025
Due Date
Jan 21, 2026
Release: Dec 9, 2025
Close: Jan 21, 2026
Work consists of construction of a fire protection water system water storage tank improvements.
AvailableWork includes construction of water system improvements. Work of contract no. 5: water supply/treatment is generally described as follows: construction of an arsenic/manganese/iron removal treatment plant (masonry building, concrete foundation/slab, wooden trusses, metal roof, filtration package, blower, chemical feed systems, booster pump package, interior plumbing, doors, windows, painting); equipping two new production wells, drop pipes; residual drying beds; site fill, paved/gravel access roads; 36-inch diameter ductile iron chlorine contact main; site piping; valves; fittings; hydrants; pressure testing and disinfection; drainage pipes; precast septic/waste tanks; site work; miscellaneous work; and site restoration.
Posted Date
Dec 19, 2025
Due Date
Jan 28, 2026
Release: Dec 19, 2025
Close: Jan 28, 2026
Work includes construction of water system improvements. Work of contract no. 5: water supply/treatment is generally described as follows: construction of an arsenic/manganese/iron removal treatment plant (masonry building, concrete foundation/slab, wooden trusses, metal roof, filtration package, blower, chemical feed systems, booster pump package, interior plumbing, doors, windows, painting); equipping two new production wells, drop pipes; residual drying beds; site fill, paved/gravel access roads; 36-inch diameter ductile iron chlorine contact main; site piping; valves; fittings; hydrants; pressure testing and disinfection; drainage pipes; precast septic/waste tanks; site work; miscellaneous work; and site restoration.
AvailableThe work generally consist of the following approximate Quantities: Sanitary Sewer Service Stub, PVC, 4" and 6" - 100 LF; Water Main, Trenched, PVC, 2" - 20 LF; Water Main, Trenched, PVC, 4" - 65 LF; Water Main, Trenchless, RJ PVC, 6" - 2,120 LF; Water Main, Trenchless, RJ Ductile Iron with Nitrile Gaskets, 6" - 180 LF; Water Service Pipe, Copper, 1" – 10 LF; Water Service Pipe, Trenchless, PE, 1" - 500 LF; Water Service Pipe, Trenchless, PE, 2" - 150 LF; Water Service Corporation, 1" – 13 EA; Water Service, Corporation, 2" - 3 EA; Water Service Curb Stop and Box, 1" - 11 EA; Water Service Curb Stop and Box, 2" - 1 EA; Gate Valve, 2" - 1 EA; Gate Valve, 4” – 2 EA; Gate Valve, 6" - 9 EA; Fire Hydrant Assembly - 3 EA; Flushing Device Assembly - 1 EA; Fire Hydrant Adjustment - 1 EA; Fire Hydrant Assembly Removal - 3 EA; Valve Box Removal - 6 EA; Water Main Connection No.1 - 1 LS; Water Main Connection No. 2 - 1 LS; Water Main Connection No. 3 - 1 LS; Water Main Connection No. 4 - 1 LS; Water Main Connection No. 5 - 1 LS; Water Main Connection No. 6 - 1 LS; Water Main Connection No. 7 - 1 LS; Water Main Connection No.8 - 1 LS; Water Main Connection No. 9 - 1 LS; Removal of Sidewalk - 45 SY; Sidewalk, PCC, 4" Thick – 15 SY; Sidewalk, PCC, 6" Thick – 30 SY; Detectable Warnings – 28 SF; Pavement Removals - 200 SY; Driveway, PCC, 8” Thick – 30 SY; Granular Surfacing, 6" Thick - 75 TON; Remove and Replace Curb and Gutter, PCC, 3' Wide - 20 LF; Temporary Traffic Control - 1 LS; Seeding, Fertilizing, and Mulching, Type 1 Mixture - 1 LS; Mobilization – 1 LS.
Posted Date
Jan 2, 2026
Due Date
Jan 28, 2026
Release: Jan 2, 2026
Close: Jan 28, 2026
The work generally consist of the following approximate Quantities: Sanitary Sewer Service Stub, PVC, 4" and 6" - 100 LF; Water Main, Trenched, PVC, 2" - 20 LF; Water Main, Trenched, PVC, 4" - 65 LF; Water Main, Trenchless, RJ PVC, 6" - 2,120 LF; Water Main, Trenchless, RJ Ductile Iron with Nitrile Gaskets, 6" - 180 LF; Water Service Pipe, Copper, 1" – 10 LF; Water Service Pipe, Trenchless, PE, 1" - 500 LF; Water Service Pipe, Trenchless, PE, 2" - 150 LF; Water Service Corporation, 1" – 13 EA; Water Service, Corporation, 2" - 3 EA; Water Service Curb Stop and Box, 1" - 11 EA; Water Service Curb Stop and Box, 2" - 1 EA; Gate Valve, 2" - 1 EA; Gate Valve, 4” – 2 EA; Gate Valve, 6" - 9 EA; Fire Hydrant Assembly - 3 EA; Flushing Device Assembly - 1 EA; Fire Hydrant Adjustment - 1 EA; Fire Hydrant Assembly Removal - 3 EA; Valve Box Removal - 6 EA; Water Main Connection No.1 - 1 LS; Water Main Connection No. 2 - 1 LS; Water Main Connection No. 3 - 1 LS; Water Main Connection No. 4 - 1 LS; Water Main Connection No. 5 - 1 LS; Water Main Connection No. 6 - 1 LS; Water Main Connection No. 7 - 1 LS; Water Main Connection No.8 - 1 LS; Water Main Connection No. 9 - 1 LS; Removal of Sidewalk - 45 SY; Sidewalk, PCC, 4" Thick – 15 SY; Sidewalk, PCC, 6" Thick – 30 SY; Detectable Warnings – 28 SF; Pavement Removals - 200 SY; Driveway, PCC, 8” Thick – 30 SY; Granular Surfacing, 6" Thick - 75 TON; Remove and Replace Curb and Gutter, PCC, 3' Wide - 20 LF; Temporary Traffic Control - 1 LS; Seeding, Fertilizing, and Mulching, Type 1 Mixture - 1 LS; Mobilization – 1 LS.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →