Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes construction of water system improvements. Work of contract no. 5: water supply/treatment is generally described as follows: construction of an arsenic/manganese/iron removal treatment plant (masonry building, concrete foundation/slab, wooden trusses, metal roof, filtration package, blower, chemical feed systems, booster pump package, interior plumbing, doors, windows, painting); equipping two new production wells, drop pipes; residual drying beds; site fill, paved/gravel access roads; 36-inch diameter ductile iron chlorine contact main; site piping; valves; fittings; hydrants; pressure testing and disinfection; drainage pipes; precast septic/waste tanks; site work; miscellaneous work; and site restoration.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Project consists of replacing a significant portion of the water distribution system including water mains, valves, hydrants, and service meters.
Posted Date
Dec 8, 2025
Due Date
Jan 6, 2026
Release: Dec 8, 2025
Close: Jan 6, 2026
Project consists of replacing a significant portion of the water distribution system including water mains, valves, hydrants, and service meters.
AvailableProvide 2022 Water Line Replacement Project Contract No. 1 – Water System Improvements.2022 Water Line Replacement Project Contract No. 1 – Water System Improvements
Posted Date
Dec 8, 2025
Due Date
Jan 6, 2026
Release: Dec 8, 2025
Close: Jan 6, 2026
Provide 2022 Water Line Replacement Project Contract No. 1 – Water System Improvements.2022 Water Line Replacement Project Contract No. 1 – Water System Improvements
AvailableWork consists of construction of a fire protection water system water storage tank improvements.
Posted Date
Dec 9, 2025
Due Date
Jan 21, 2026
Release: Dec 9, 2025
Close: Jan 21, 2026
Work consists of construction of a fire protection water system water storage tank improvements.
AvailableThe City of Perry, KS (Owner) is soliciting bids for Water System Improvements consisting of replacing a significant portion of the water distribution system including water mains, valves, hydrants, and service meters. A pre-bid conference is scheduled for 2025-12-22 at 2:30 PM at Perry City Hall, and bids will be accepted until 2026-01-06 at 10:00 AM. The project is publicly bid (Invitation for Bid); bidders must register on the planroom site to order/ download contract documents and submit questions to the Engineer (Abby Mills).
Posted Date
Dec 4, 2025
Due Date
Jan 6, 2026
Release: Dec 4, 2025
Close: Jan 6, 2026
The City of Perry, KS (Owner) is soliciting bids for Water System Improvements consisting of replacing a significant portion of the water distribution system including water mains, valves, hydrants, and service meters. A pre-bid conference is scheduled for 2025-12-22 at 2:30 PM at Perry City Hall, and bids will be accepted until 2026-01-06 at 10:00 AM. The project is publicly bid (Invitation for Bid); bidders must register on the planroom site to order/ download contract documents and submit questions to the Engineer (Abby Mills).
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →