Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Garfield County Rural Water District #6 is soliciting sealed bids for Water System Improvements, to be received at the District office in Garber, Oklahoma. Bids are due by 2:00 p.m. on January 29, 2026, and all official notifications and bidding documents are available via the designated bidding website, CivCast. The project is advertised via legal notice in the Enid News & Eagle with publications on January 8 and January 15, 2026.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Work includes improvements to the village water treatment system which includes new well pumps, piping, plumbing and electrical work to install a new pressure filter system.
Posted Date
Dec 30, 2025
Due Date
Jan 14, 2026
Release: Dec 30, 2025
Close: Jan 14, 2026
Work includes improvements to the village water treatment system which includes new well pumps, piping, plumbing and electrical work to install a new pressure filter system.
Work consists of construction of a fire protection water system water storage tank improvements.
Posted Date
Dec 9, 2025
Due Date
Jan 21, 2026
Release: Dec 9, 2025
Close: Jan 21, 2026
Work consists of construction of a fire protection water system water storage tank improvements.
AvailableWork includes construction of water system improvements. Work of contract no. 5: water supply/treatment is generally described as follows: construction of an arsenic/manganese/iron removal treatment plant (masonry building, concrete foundation/slab, wooden trusses, metal roof, filtration package, blower, chemical feed systems, booster pump package, interior plumbing, doors, windows, painting); equipping two new production wells, drop pipes; residual drying beds; site fill, paved/gravel access roads; 36-inch diameter ductile iron chlorine contact main; site piping; valves; fittings; hydrants; pressure testing and disinfection; drainage pipes; precast septic/waste tanks; site work; miscellaneous work; and site restoration.
Posted Date
Dec 19, 2025
Due Date
Jan 28, 2026
Release: Dec 19, 2025
Close: Jan 28, 2026
Work includes construction of water system improvements. Work of contract no. 5: water supply/treatment is generally described as follows: construction of an arsenic/manganese/iron removal treatment plant (masonry building, concrete foundation/slab, wooden trusses, metal roof, filtration package, blower, chemical feed systems, booster pump package, interior plumbing, doors, windows, painting); equipping two new production wells, drop pipes; residual drying beds; site fill, paved/gravel access roads; 36-inch diameter ductile iron chlorine contact main; site piping; valves; fittings; hydrants; pressure testing and disinfection; drainage pipes; precast septic/waste tanks; site work; miscellaneous work; and site restoration.
Procurement of materials, equipment, and labor for the construction of a Well House and Treatment system, excluding the Well, Well Pump, and 250,000 Gallon Elevated Storage Tank, for the Phase 5 Water System Improvements.
Posted Date
-
Due Date
Jan 14, 2026
Close: Jan 14, 2026
Procurement of materials, equipment, and labor for the construction of a Well House and Treatment system, excluding the Well, Well Pump, and 250,000 Gallon Elevated Storage Tank, for the Phase 5 Water System Improvements.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis