Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project includes: 1 ls, preparing the right of way; 10,800 lf, temporary sediment control fence; 190 lf boring and casing, 30"; 40 lf casing by other than open cut, 30"; 10,981 PVC (C-905, DR-18) pipe, 16"16"; 13 ea fire hydrant assembly, restrained; 6 ea relocate existing service; 4.2 tn ductile iron fittings; 5 ea combination air valve, 2"; 28 ea gate valve and box, 16". See attached file.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Well #4 and Well #5 Electrical and Water System Improvement project includes various electrical, mechanical, HVAC, SCADA and site improvements to the existing Well #4 and Well #5 stations. Improvements include the following: selective demolition, furnish and install existing motor control centers, appropriate surge protection, step-down transformers, 120/208V panelboards, and install new 100hp variable frequency drives; replace existing interior and exterior lighting; upgrade of existing SCADA panels; furnish and install all necessary piping to connect new pump control valve, painting of all process piping; furnish and install new electrical unit heaters, exhaust fans, and louver actuators; existing driveway replacement for well #5, construction of a permanent foundation for the existing well 5 generator, well #5 generator modification and installation on permanent foundation, perimeter fencing removal and replacement, and new sliding access gates; and replacement of the existing acoustical panel ceilings. The project includes the installation of a new 300hp variable frequency drive and furnish and install motor replacement of the existing Well #2.
Posted Date
Dec 10, 2025
Due Date
Jan 30, 2026
Release: Dec 10, 2025
Close: Jan 30, 2026
Well #4 and Well #5 Electrical and Water System Improvement project includes various electrical, mechanical, HVAC, SCADA and site improvements to the existing Well #4 and Well #5 stations. Improvements include the following: selective demolition, furnish and install existing motor control centers, appropriate surge protection, step-down transformers, 120/208V panelboards, and install new 100hp variable frequency drives; replace existing interior and exterior lighting; upgrade of existing SCADA panels; furnish and install all necessary piping to connect new pump control valve, painting of all process piping; furnish and install new electrical unit heaters, exhaust fans, and louver actuators; existing driveway replacement for well #5, construction of a permanent foundation for the existing well 5 generator, well #5 generator modification and installation on permanent foundation, perimeter fencing removal and replacement, and new sliding access gates; and replacement of the existing acoustical panel ceilings. The project includes the installation of a new 300hp variable frequency drive and furnish and install motor replacement of the existing Well #2.
AvailableProcurement of materials, equipment, and labor for the construction of a Well House and Treatment system, excluding the Well, Well Pump, and 250,000 Gallon Elevated Storage Tank, for the Phase 5 Water System Improvements.
Posted Date
-
Due Date
Jan 14, 2026
Close: Jan 14, 2026
Procurement of materials, equipment, and labor for the construction of a Well House and Treatment system, excluding the Well, Well Pump, and 250,000 Gallon Elevated Storage Tank, for the Phase 5 Water System Improvements.
AvailableRemoval of existing asphalt and existing concrete sidewalks and gutters in pipeline and service line paths. All removed materials will be replaced to match existing, Installation of new 12" C900 PVC water pipeline with all the valves and fittings, Installation of new 6" C900 PVC water pipeline with all the valves and fittings. Removal and replacement of existing fire hydrants. Clean, disinfect, and pressure test new water pipelines. Installation of a new altitude and pressure relief valve vault at the water tower and connect to waterline coming from City and connect to water tower. Reconnect existing service lines.
Posted Date
Nov 16, 2025
Due Date
Jan 15, 2026
Release: Nov 16, 2025
Close: Jan 15, 2026
Removal of existing asphalt and existing concrete sidewalks and gutters in pipeline and service line paths. All removed materials will be replaced to match existing, Installation of new 12" C900 PVC water pipeline with all the valves and fittings, Installation of new 6" C900 PVC water pipeline with all the valves and fittings. Removal and replacement of existing fire hydrants. Clean, disinfect, and pressure test new water pipelines. Installation of a new altitude and pressure relief valve vault at the water tower and connect to waterline coming from City and connect to water tower. Reconnect existing service lines.
This solicitation, titled 'Replacement Of Existing Battery System', is issued by the Suffolk County Department of Public Works in Yaphank, New York. It seeks the removal and replacement of existing sealed AGM battery systems at various county facilities, including police precincts, to ensure a reliable power supply. The response deadline for this RFP is January 8, 2026.
Posted Date
Dec 19, 2025
Due Date
Jan 8, 2026
Release: Dec 19, 2025
Close: Jan 8, 2026
This solicitation, titled 'Replacement Of Existing Battery System', is issued by the Suffolk County Department of Public Works in Yaphank, New York. It seeks the removal and replacement of existing sealed AGM battery systems at various county facilities, including police precincts, to ensure a reliable power supply. The response deadline for this RFP is January 8, 2026.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis