CountyNY
Posted
Oct 16, 2026
Nov 19, 2026
Odor Control Media - Remove, Replace and Dispose Existing Media RFP
Work include remove, replace and dispose of existing media from absorbers.
Description: Las Virgenes Municipal Water District is seeking bids for the Water Reclamation Facility and Lift Station: Odor Control and Filtration Media Replacement project. The Las Virgenes Municipal Water District-Triunfo Sanitation District Joint Powers Authority owns and operates the Tapia Water Reclamation Facility and Sewer Lift Stations 1 and 2, which use carbon towers for odor control and tertiary filtration tanks. The project includes replacing the activated carbon annually and replacing tertiary filtration media on a recurring basis, with the plan accounting for two filters per year.
SpecialDistrict · CA, US
Decision makers connected to this RFP from Las Virgenes Muncipal Water Dist.
Solicitation files and supporting documents for this bid.
Adjacent opportunities open for bidding right now.
CountyNY
Posted
Oct 16, 2026
Nov 19, 2026
Work include remove, replace and dispose of existing media from absorbers.
Special DistrictCA
Posted
Nov 16, 2026
Dec 14, 2026
Monterey One Water (M1W) invites qualified contractors to submit bids to provide all the necessary labor, materials, and equipment required to replace the Odor Scrubber Media at the Forst Ord Pump Station, in accordance with the Scope of Services. Scope of Work The work should include all labor, equipment, materials, transportation, and disposal necessary to: Remove the spent media from both vessels. Transport and dispose of the spent media at an authorized regional hazardous-waste facility. The material does not meet our local landfill’s acceptance criteria, so hazardous-waste handling and disposal must be included, consistent with the original contractor quote. Inspect and clean accessible vessel interiors and media supports. Supply and install approved replacement media. Assist with startup and provide installation, testing, and disposal documentation, including applicable manifests and weight tickets. Facility Operations and Work Schedule Fort Ord Pump Station must remain operational throughout the project. No shutdowns or interruptions are anticipated. Normal working hours are Monday through Friday, 7:00 a.m. to 5:00 p.m. No bid will be considered for award unless properly and successfully submitted through the electronic bid management system at https://vendors.planetbids.com/portal/79520/portal-home by the date and time specified on the cover page of this IFB. All bids must be signed by an authorized representative. All required sections, including pricing, shall be submitted via the website. Bidder is solely responsible for “on time” submission of their electronic bid. The bid management system will not accept late bids and no exceptions shall be made. Bidders will receive an e-bid confirmation number with a time stamp from the bid management system indicating their bid was submitted successfully. M1w will only receive those bids that were transmitted successfully. DO NOT FAX OR E-MAIL.
CityNC
Posted
-
Nov 19, 2026
Provide professional engineering services for replacement of the ultraviolet (uv) disinfection system.
CityFL
Posted
Nov 2, 2026
Dec 9, 2026
Work includes 1 LS lift station w-27 upgrades; 1 LS furnish and deliver generator; 1 LS bypass pumping; 85 LF cctv 48" sanitary sewer; 85 LF cipp lining 48" sanitary sewer; 1 LS reconnect rotary park lift station to existing system; 1,600 LF furnish and install 20" ductile iron force main; 30,000 pounds furnish and install ductile iron fittings; 2 EA furnish and install 20" plug valves; 5 EA furnish and install combination air valve assemblies in vaults; 500 LF restrain existing 48" force main; 2,500 LF cap, grout and abandon existing 10", 12" and 20" force mains. See attached file.