CountyNY
Jul 22, 2026
Closes
Aug 19, 2026
Rehabilitation of Hangars 2&3 Phase 1
Project includes rehabilitating the roofs; abatement of hazardous materials such as asbestos, and replacing broken windows.
Description: Water plant no. 3 rehabilitation phase 2.
SpecialDistrict · TX, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalProcurement and program contacts connected to Clear Lake City Water Authority.
Adjacent opportunities open for bidding right now.
CountyNY
Jul 22, 2026
Closes
Aug 19, 2026
Project includes rehabilitating the roofs; abatement of hazardous materials such as asbestos, and replacing broken windows.
Greater Binghamton/Edwin A Link field
Special DistrictNY
-
Closes
Aug 19, 2026
The Greater Binghamton Airport has issued an invitation to bid for Phase 1 of the rehabilitation of Hangars 2 and 3 at the airport, a project administered by consulting engineer McFarland Johnson on behalf of the airport owner. The scope includes roof replacement, office renovation, HVAC upgrades and related improvements to the historic hangar structures as part of a multi-phase renovation program pursued with state and federal grant support. Bids are due August 19, 2026 at 2:00 PM following a pre-bid meeting on July 29, 2026 at 11:00 AM.
Jul 23, 2026
Closes
Aug 19, 2026
The work includes removal and disposal of (4) existing dust collectors on the roof of the south water treatment plant and installation of new dust collectors, compressor and dryer, pressure relief valves, piping, and associated electrical facilities and controls and other appurtenant and related items of construction. The work also includes modifications to an existing crane system including foundation modifications, installation of frames, removal of the existing coiling door and replacing with a double door.
CountyLA
Aug 6, 2026
Closes
Sep 3, 2026
St. James Parish Government is soliciting sealed, lump-sum bids from a single-prime contractor to rehabilitate the clarifier system at the Convent Water Treatment Plant. The work includes mechanical, electrical, and structural rehabilitation, with required bid security and a mandatory pre-bid meeting and site walk-through on August 20, 2026. Bids are due at 10:00 a.m. on September 3, 2026, and the posting identifies the project as an Invitation for Bid rather than a grant program.