Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Removal of existing water meters, located either in the valve box or valve vault in City right-of-way or the resident's home, and replacement with smart water meters.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The project will include the installation of approx 198 secondary water connections throughout the area of the city.
Posted Date
Jan 12, 2026
Due Date
Jan 27, 2026
Release: Jan 12, 2026
Close: Jan 27, 2026
The project will include the installation of approx 198 secondary water connections throughout the area of the city.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide Gym Building and Cafeteria Building Roof and Soffit Replacement Project - Phase II.
Posted Date
-
Due Date
Feb 18, 2026
Close: Feb 18, 2026
Provide Gym Building and Cafeteria Building Roof and Soffit Replacement Project - Phase II.
AvailableConstruction of water distribution system pipelines & components replacing existing water infrastructure consisting of approx 50,667 LF of 8" dia pipelines and 7,581 LF of 12" diameter pipelines. The project will include all pipes, associated valves, fittings hydrants, & water appurtenances, encasements, water service line & meter replacement, cutting & patching of streets, all testing, disinfection, swppp measures, traffic control.
Posted Date
-
Due Date
Jan 29, 2026
Close: Jan 29, 2026
Construction of water distribution system pipelines & components replacing existing water infrastructure consisting of approx 50,667 LF of 8" dia pipelines and 7,581 LF of 12" diameter pipelines. The project will include all pipes, associated valves, fittings hydrants, & water appurtenances, encasements, water service line & meter replacement, cutting & patching of streets, all testing, disinfection, swppp measures, traffic control.
AvailableThis RFP is for the construction of Phase II Water System Improvements.
Posted Date
Jan 15, 2026
Due Date
Feb 13, 2026
Release: Jan 15, 2026
Close: Feb 13, 2026
This RFP is for the construction of Phase II Water System Improvements.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →