Summary
160 LF, remove and replace concrete curb & gutter; 2,132 SF, remove concrete walk; 25 SY, remove concrete driveway pavement; 66 SY, remove bituminous driveway pavement; 58 each, remove water service and curb box; 74 SY, type SP 9.5 wear CRS mix (3:C) 4.0" thick; 58 each, 1" curb stop & box; 2,500 LF, 1" type k Copper pipe installed by trench less method; 2,132 SF, 4" concrete walk; 89 SY, 6" concrete driveway pavement; 50 each, connect to existing indoor plumbing, unfinished basement; 8 each, connect to existing indoor plumbing, finished basement; 58 each, provide filter pitcher; 58 each, freezing water services.