CityCA
Posted
Sep 23, 2026
Oct 15, 2026
Water Main Replacement and Street Rehabilitation
Project consists of replace approximately 7,200 LF of existing water main and 252 service line, fire hydrants. This project would replace the existing four-inch and six-inch cast iron water mains with new 8 ductile iron pipe water mains. The project may include asphalt paving, replacing damaged sidewalk, curb and gutter, and installing new ada ramps.
