Closing soon

Water Main Rehab Package 5B RFP

Description: Project consists of the following elements of work: construction stormwater and erosion control; demolition; water main improvements including new 6" to 12" ductile iron pipe, gate valves, pressure reducing station and spot improvements; storm drain improvements; assist spu with water main service connections and temporary and permanent water main connections; install and maintain excavation dewatering systems; install and maintain trench dams to prevent methane gas travel in trench excavation at site 5b-3: 43rd ave s; handling and disposal of contaminate/non-hazardous soil and water; and pavement restoration including ada ramps.

Buyer
City of Seattle

City · WA, US

Released
Oct 28, 2026
Closes
Nov 18, 2026(5 days left)
See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
See your top 10 accounts