CityID
Posted
Jan 16, 2026
Oct 7, 2026
Water Division Inventory Replenishment *RE-BID*
Work includes 13500' of pipe: 8" push-on joint: class 50 or greater; wall thickness no less than. 27"; pipe must meet awwa c104/c111/c151, 5500' of pipe: 12" push-on joint: class 50 or greater; wall thickness no less than. 31 inches; pipe must meet awwa c104/c111/c151, 500' of pipe: 16" push-on joint: class 50 or greater; wall thickness no less than. 34"; pipe must meet awwa c104/c111/c151, 400 ea of polyethylene foam insulation pad; 18" x 4"; for use with 18" diameter meter box. See outside link.