Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Aspendell Mutual Water Company
Operation, testing and maintenance of AMWC's Community Water System. This water system provides drinking water and firefighting water to a community about 17 miles southwest of Bishop.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Borough of Elmwood Park
Licensed water operator to provide professional services to the borough on all general water operating services related to the operations of the borough.
Posted Date
Nov 17, 2025
Due Date
Dec 9, 2025
Release: Nov 17, 2025
Borough of Elmwood Park
Close: Dec 9, 2025
Licensed water operator to provide professional services to the borough on all general water operating services related to the operations of the borough.
AvailableVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Brentwood
Provide engineering design services for citywide non-potable water distribution project. The existing pump station consists of two booster pumps and a jockey pump located in a concrete masonry unit (CMU) utility building.
Posted Date
Nov 18, 2025
Due Date
Dec 12, 2025
Release: Nov 18, 2025
City of Brentwood
Close: Dec 12, 2025
Provide engineering design services for citywide non-potable water distribution project. The existing pump station consists of two booster pumps and a jockey pump located in a concrete masonry unit (CMU) utility building.
AvailableFermi National Accelerator Laboratory (Fermilab) (Contractor)
Provide PIP-II Cryogenic Distribution System - Distribution Valve Box.
Posted Date
Oct 24, 2025
Due Date
Nov 29, 2025
Release: Oct 24, 2025
Fermi National Accelerator Laboratory (Fermilab) (Contractor)
Close: Nov 29, 2025
Provide PIP-II Cryogenic Distribution System - Distribution Valve Box.
AvailableTownship of Grand Tower
Project consists of water distribution system improvements.
Posted Date
Oct 16, 2025
Due Date
Dec 2, 2025
Release: Oct 16, 2025
Township of Grand Tower
Close: Dec 2, 2025
Project consists of water distribution system improvements.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →