Discover Opportunities months before the RFP drops
Learn more βRetrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Town of Hampstead
The Town of Hampstead seeks bids for the Water Distribution System Improvements 2026 project to install a temporary bypass water service system and construct water lines on Old Field Lane, Hampshire Road, and Sunder Drive. Work includes installing approximately 680 feet of 6-inch DIP, a new water main, hydrant and services, testing, and traffic control, and a mandatory pre-bid meeting is scheduled for 11/4/2025.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs β target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
City of Burlington
provide Construction Inspection Services for distribution system improvement work in Calendar Year 2026. The required oversight for this project includes pre-bid services to get familiar with project, administer weekly construction meetings, inspection, specific construction administration tasks, and sampling/testing of construction materials. The consultant hired to perform these services should be qualified to perform a variety of inspection, record keeping and construction engineering activities as outlined in this RFQ. The construction activities requiring Construction Inspection Services includes, but is not limited to, the following: Replacement of approximately 2,500 feet of water main, paving, surface restoration, approved traffic control measures and all necessary work.
Posted Date
Nov 18, 2025
Due Date
Dec 17, 2025
Release: Nov 18, 2025
City of Burlington
Close: Dec 17, 2025
provide Construction Inspection Services for distribution system improvement work in Calendar Year 2026. The required oversight for this project includes pre-bid services to get familiar with project, administer weekly construction meetings, inspection, specific construction administration tasks, and sampling/testing of construction materials. The consultant hired to perform these services should be qualified to perform a variety of inspection, record keeping and construction engineering activities as outlined in this RFQ. The construction activities requiring Construction Inspection Services includes, but is not limited to, the following: Replacement of approximately 2,500 feet of water main, paving, surface restoration, approved traffic control measures and all necessary work.
AvailableTownship of Grand Tower
Project consists of water distribution system improvements.
Posted Date
Oct 16, 2025
Due Date
Dec 2, 2025
Release: Oct 16, 2025
Township of Grand Tower
Close: Dec 2, 2025
Project consists of water distribution system improvements.
AvailableMunicipality of Anchorage
Provide water distribution system condition assessment services.
Posted Date
Oct 23, 2025
Due Date
Nov 25, 2025
Release: Oct 23, 2025
Municipality of Anchorage
Close: Nov 25, 2025
Provide water distribution system condition assessment services.
AvailableCity of Lamar
Replace the existing water distribution system, with polyvinyl chloride (PVC) and polyethylene (PE) water distribution system piping. Work includes, but is not limited to, installation of water mains, service lines, meter boxes, fire hydrants, valves and fittings: connecting to existing water distribution system; and completion of all associated site work.
Posted Date
Nov 7, 2025
Due Date
Dec 16, 2025
Release: Nov 7, 2025
City of Lamar
Close: Dec 16, 2025
Replace the existing water distribution system, with polyvinyl chloride (PVC) and polyethylene (PE) water distribution system piping. Work includes, but is not limited to, installation of water mains, service lines, meter boxes, fire hydrants, valves and fittings: connecting to existing water distribution system; and completion of all associated site work.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo βVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis