Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes installation of a new recessed wet well mounted pump station within a new below grade concrete and wood framed constructed building structure at the wastewater treatment plant includes site work, demolition work, removal and relocation of existing garage structure, earthwork, ledge removal, backfill and compaction, cast-in-place concrete structures, wood framed building, main pump station equipment and controls, drain pump station equipment and controls, all associated process piping and supports, approximately 360 LF of 10" DI force main piping, 1" cts pe process water piping and underground fiber option cable in a common trench; loam and seed, erosion control, temporary pumping, test pits, metals, electrical, scada system modifications, heating and ventilation, and all incidentals for the complete installation of a new main pump station
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Operation and maintenance of the wastewater treatment plant at international airport which consists of the pump station, triturator, south ramp lift station, washrack, and management of the r1 reclaimed water and landscaping adjacent to the wastewater treatment plant and lift station.
Posted Date
Dec 19, 2025
Due Date
Jan 23, 2026
Release: Dec 19, 2025
Close: Jan 23, 2026
Operation and maintenance of the wastewater treatment plant at international airport which consists of the pump station, triturator, south ramp lift station, washrack, and management of the r1 reclaimed water and landscaping adjacent to the wastewater treatment plant and lift station.
AvailableReplace thirteen (13) valve actuators at the City's Wastewater Treatment Plant. The actuators will be installed for valves that serve both the sequencing batch reactors (SRBs) and Aerobic Digester B.
Posted Date
Jan 10, 2026
Due Date
Feb 3, 2026
Release: Jan 10, 2026
Close: Feb 3, 2026
Replace thirteen (13) valve actuators at the City's Wastewater Treatment Plant. The actuators will be installed for valves that serve both the sequencing batch reactors (SRBs) and Aerobic Digester B.
AvailableReplace thirteen (13) valve actuators at the City's Wastewater Treatment Plant. The actuators will be installed for valves that serve both the sequencing batch reactors (SRBs) and Aerobic Digester B.
Posted Date
Jan 10, 2026
Due Date
Feb 3, 2026
Release: Jan 10, 2026
Close: Feb 3, 2026
Replace thirteen (13) valve actuators at the City's Wastewater Treatment Plant. The actuators will be installed for valves that serve both the sequencing batch reactors (SRBs) and Aerobic Digester B.
AvailableWastewater treatment plant motor control center replacement. Removal and disposal of existing motor control center, installation of a new motor control center with an elevated galvanized steel platform, and application of floor coating system.
Posted Date
-
Due Date
Feb 5, 2026
Close: Feb 5, 2026
Wastewater treatment plant motor control center replacement. Removal and disposal of existing motor control center, installation of a new motor control center with an elevated galvanized steel platform, and application of floor coating system.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis