CityIA
Posted
-
Dec 17, 2026
Wastewater Treatment Facility Improvements RFP
New headworks building (pre-cast concrete) with mechanically cleaned stair screen, screenings washing and compactor, stacked tray grit removal, grit washing, and submersible raw wastewater influent pumps new 4 cell sequencing batch reactor (SBR) treatment process new post treatment building (pre-cast concrete) with tertiary filters (pile cloth) and UV disinfection new biosolids complex building (pre-cast concrete) with rotary drum thickener and sludge pumping new 0.75 MG sludge storage tank (pre-stressed concrete) new operations building (pre-engineered metal building) with blowers (rotary screw), air compressors, compressed air storage tanks, electrical room, mechanical room, lab and control room, and locker room facilities new maintenance building (Bid Alternate A), a pre-engineered metal building demolition of existing plant facilities and structures site grading, paving, structure excavation, underground utilities, and other site civil works electrical work including a new stand-by generator, power and controls, and new SCADA system HVAC and plumbing work for all new buildings all other work as required by the plans and specifications.
