Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The City of Dorris is soliciting sealed bids for the Wastewater Treatment & Collection Improvements project, which includes constructing a new wastewater treatment plant, rehabilitating an existing sewer lift station, replacing a pressure sewer main, and addressing problematic sewer main locations along with miscellaneous sewer system items. Bids are due at Dorris City Hall by 1:00 p.m. local time on March 4, 2026, when they will be publicly opened and read. The engineer’s estimate is approximately $4,950,000 and the work must be completed within 730 calendar days.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Provide wastewater treatment plant improvements.
Posted Date
Jan 21, 2026
Due Date
Feb 11, 2026
Release: Jan 21, 2026
Close: Feb 11, 2026
Provide wastewater treatment plant improvements.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes wastewater treatment plant improvements electrical equipment.
Posted Date
Jan 22, 2026
Due Date
Feb 23, 2026
Release: Jan 22, 2026
Close: Feb 23, 2026
Work includes wastewater treatment plant improvements electrical equipment.
AvailableConstruction of a new centralized wastewater treatment plant including new headworks, grit removal, process building, secondary treatment process and associated concrete basins, aeration system, blowers, onsite lift stations, tertiary filtration for metals removal, UV disinfection system, dewatering equipment, chemical feed equipment, silo, and all necessary ancillary piping, electrical, controls, earthwork, and biosolids removal and disposal. Also included is a new lift station at the Henderson WWTP and force main from the Henderson to Veteran's WWTP site for consolidation of all wastewater treatment at the Veteran’s site. Also included are several collection system improvement components throughout the city's collection system. Finally, an office and laboratory building is included.
Posted Date
Dec 5, 2025
Due Date
Mar 12, 2026
Release: Dec 5, 2025
Close: Mar 12, 2026
Construction of a new centralized wastewater treatment plant including new headworks, grit removal, process building, secondary treatment process and associated concrete basins, aeration system, blowers, onsite lift stations, tertiary filtration for metals removal, UV disinfection system, dewatering equipment, chemical feed equipment, silo, and all necessary ancillary piping, electrical, controls, earthwork, and biosolids removal and disposal. Also included is a new lift station at the Henderson WWTP and force main from the Henderson to Veteran's WWTP site for consolidation of all wastewater treatment at the Veteran’s site. Also included are several collection system improvement components throughout the city's collection system. Finally, an office and laboratory building is included.
AvailableWork includes waste water treatment plant improvements.
Posted Date
Nov 24, 2025
Due Date
Feb 3, 2026
Release: Nov 24, 2025
Close: Feb 3, 2026
Work includes waste water treatment plant improvements.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →